Download Print this page
FEEDER LEADER BOSS 3 PTL Original Operator's Manual

FEEDER LEADER BOSS 3 PTL Original Operator's Manual

Feeder leader range

Advertisement

Quick Links

operators manual
'THE BOSS'
FEEDER LEADER RANGE
'THE BOSS'
3 PTL
Original
'THE BOSS'
3 PTL
Feedlot
Feeder
'THE BOSS'
Trailed 2 Bale Feeder
MANUFACTURED BY:
THE FEEDER LEADER
COMPANY LTD
2 Miro St – PO Box 1282, Taupo 3351
Phone New Zealand +64 (0)7 378 4533

Advertisement

loading

Summary of Contents for FEEDER LEADER BOSS 3 PTL Original

  • Page 1 ‘THE BOSS’ FEEDER LEADER RANGE ‘THE BOSS’ 3 PTL Original ‘THE BOSS’ 3 PTL Feedlot Feeder ‘THE BOSS’ Trailed 2 Bale Feeder MANUFACTURED BY: THE FEEDER LEADER COMPANY LTD 2 Miro St – PO Box 1282, Taupo 3351...
  • Page 2: Warranty Conditions

    (iv) The dealer should then commence to carry out the necessary repair or replacement work as instructed. (v) A claim form will be sent to the dealer and must be submitted in writing to Feeder Leader Company Ltd within 14 days of the date of the Warranty Order No being issued.
  • Page 3 APC 001 APC 002 general safe use Operating the Feeder Leader involves several safe work practices which are also noted in the machinery risk assessment page, including: !!! Read all warning labels on machine !!! Disengage drive/power source and turn off tractor before carrying out servicing,...
  • Page 4 Ensure that the latch is engaged before driving off. FEEDING OUT – Check to see which way the bale is rolled by engaging the Feeder Leader’s hydraulic motor. If you do not wish to feed out as much, then simply pull or push the tracker’s auxiliary lever the other way. Pick a suitable...
  • Page 5 A clean machine will perform better. THE FEEDER LEADER 2 BALE TRAILED FEEDER To load round and square bales, put the forks on the rear fl at on theground in loading position and back them under the bale. A quick lift will put the bale into the feeder, if it doesn’t go completely,...
  • Page 6 page 5...
  • Page 7 Please remember to fi ll in and return the Warranty Registration form on the back page of this manual. Warranty is VOID if this registration is not received by The Feeder Leader Company Ltd within 28 days of the delivery of the machine.
  • Page 8: Warranty Registration

    2 Miro St – PO Box 1282, Taupo 3351 Phone New Zealand +64 (0)7 378 4533 warranty registration IMPORTANT: Warranty is VOID if this registration is not received by The Feeder Leader Company Ltd within 28 days of the delivery of the machine. Dealer’s Name: ____________________________________________________________ Address: ____________________________________________________________ Purchaser’s Name: ____________________________________________________________...

This manual is also suitable for:

Boss 3 ptl feedlot feederBoss trailed 2 bale feeder