Download Print this page

KEY-LINK American Series Assembly Instructions

Vertical cable infill

Advertisement

Quick Links

Recommended Tools
• Safety Glasses
• Tape Measure & Pencil
• Level
• Drill & Bits (1/4", 3/16", 17/32")
• Hammer Drill (if concrete)
• Circular Saw w/ Fine-Tooth Aluminum
Cutting Blade
• Rubber Mallet
• Socket Wrench (7/16" socket)
Available from Key-Link
Tension Gauge
These directions are only a guide and may not address every situation.
Always wear proper safety equipment while assembling and installing.
The installer should obtain all required building permits and follow all installation procedures in accordance with
applicable building code requirements.
Key-Link Fencing and Railing Inc. shall not be held liable for improper or unsafe installations.
Applying paint, other than Key-Link's touch up paint, will void your warranty.
To ensure proper coverage by our warranty please visit our website and complete the warranty form and mail to:
Key-Link Fencing & Railing, Inc., 150 Orlan Road, New Holland, PA 17557
WARNING: This product can expose you to chemicals including Quartz (crystalline silica), which is known to the
State of California to cause cancer, and Hexavalent Chromium, which is known to the State of California to cause
birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.
Air Ratchet
Cable Vise Grip
(optional)
KeyLinkOnline.com
CABLE INFILL
What's Included
• Top & Bottom Rail w/ Cables attached
• Mounting Brackets & Screws
(Posts, Caps, & Trim packaged separate)
• Stainless Steel Support Rods
• Flange Nuts
• Snap on Section Support
(For sections over 6')
Top Level Bracket
Snap on Section
Support
Bottom Level
Bracket
Tip:
Wear clean, new gloves when handling stainless steel
parts to prevent corrosion from oil and dirt.
Vertical
Flange Nuts
#12 Flat-Head
#10 Pan-Head
Screws
Screws
KFRIG180928

Advertisement

loading
Need help?

Need help?

Do you have a question about the American Series and is the answer not in the manual?

Questions and answers

Summary of Contents for KEY-LINK American Series

  • Page 1 The installer should obtain all required building permits and follow all installation procedures in accordance with applicable building code requirements. • Key-Link Fencing and Railing Inc. shall not be held liable for improper or unsafe installations. • Applying paint, other than Key-Link’s touch up paint, will void your warranty.
  • Page 2 Install Railing Post & Post Trim Space Posts according to *application and Top Rail length. Place leveling plate (highlighted) between Post and mounting surface. Attach to structural surface using bolts or lags (not included). Partially Tighten prior to levelling. Using 3/16"...
  • Page 3 Place Rail and Cable Section Slide the Brackets over each Rail. Using two 2½" tall blocks; lower the Section to be installed onto the blocks. Recommended: If using 2½" Post; offset one section at a corner, by raising it an additional 1/8" (helps avoid Mounting Bracket screw interference).
  • Page 4 Installer Tip: Cut two blocks (highlighted) to fill the distance between the Rails, and place them on either end of a section prior to installation. This helps keep the section rigid during installation. Stair Rail Installation Measure from inside edge between Posts subtracting 1/4"...