PARALLEL SLIDE RAIL SYSTEM
EG-PV
TRENCH SHORING SYSTEMS FROM SHORING PROFESSIONALS
Hocksteiner Weg 30
Tel: +49 21 66-3 98 63 60
Site: www.euroverbau.de
rench shoring equipment
Production - Sales - Rental - Service
D-41189 Mönchengladbach
Fax: +49 21 66-3 98 63 78
Mail: info@euroverbau.de
GmbH

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EG-PV 400 and is the answer not in the manual?

Questions and answers

Summary of Contents for euro verbau EG-PV 400

  • Page 1 M NU L PARALLEL SLIDE RAIL SYSTEM EG-PV GmbH Hocksteiner Weg 30 D-41189 Mönchengladbach Tel: +49 21 66-3 98 63 60 Fax: +49 21 66-3 98 63 78 Site: www.euroverbau.de Mail: info@euroverbau.de TRENCH SHORING SYSTEMS FROM SHORING PROFESSIONALS rench shoring equipment Production - Sales - Rental - Service...
  • Page 2 M NU L PARALLEL SLIDE RAIL SYSTEM EG-PV These instructions for use must be presented to the building site personnel. 1. General purpose of use Extremely solid slide-rail system with a pipe culvert height of up to 1.80 m. When the system is used as di- rected, the shoring can be performed with the occurrence of virtually no settling.
  • Page 3 M NU L PARALLEL SLIDE RAIL SYSTEM EG-PV 5. Installation a) At right angles to the shoring trench direction, excavate a trench with a length equal to the shoring width and a depth of approx. 2.00 m. Press the mounted slide-rail pair into this ditch (Fig. 1) suffi- ciently far that it is prevented from falling over.
  • Page 4 ©2012 EUROVERBAU • Die hier veröffentlichten Inhalte sind urheberrechtlich geschützt. Der Inhalt darf ohne schriftliche Genehmigung der Herausgeber weder bearbeitet, übersetzt, vervielfältigt oder verbreitet werden. 2012A M NU L PARALLEL SLIDE RAIL SYSTEM EG-PV e) When the plate head is approx. 0.10 m before reaching the upper edge of Fig.