Download Print this page

HOMEGRID Stack'd Series Installation Manual

Hide thumbs Also See for Stack'd Series:

Advertisement

Quick Links

HomeGrid Stack'd Series Installation Guide
1. Safety Precautions
It is very important to read the user manual carefully before installing or using battery. Failure to
do so or to follow any of the instructions or warnings in this document can result in electrical
shock, serious injury, or death. Installing the battery incorrectly can permanently damage battery
or rendering it inoperable.
For more information about this product, please visit the official website:
http://www.homegridenergy.com
Work on a Li-ion Battery should be carried out by qualified personnel only.
1.1. General warnings
While working on the Li-ion Battery wear protective eyeglasses and clothing.
Any internal lithium ion cell material such as electrolyte or powder on the skin or in the
eyes must be flushed with plenty of clean water immediately. Then seek medical
assistance. Any material spilled on clothing should be rinsed out with water.
Explosion and fire hazard. Terminals of the Li-ion Battery are always alive; therefore, do not
place items or tools on the Li-ion Battery. Avoid short circuits, over discharges and high
charge currents. Use insulated tools. Do not wear any metallic items such as watches,
bracelets, etc. In case of fire; you must use a type D, foam or CO2 fire extinguisher.
Do not open or dismantle the battery. Electrolyte is very corrosive. In normal
working conditions you will not have any contact with the electrolyte. If the battery
casing is damaged do not touch the exposed electrolyte or powder because it is
corrosive.
Li-ion batteries are heavy. If involved in an traffic accident they can become a
projectile! Ensure adequate and secure mounting and always use suitable handling
equipment for transportation.
Handle with care because this lithium ion battery is sensitive to mechanical forces shock.
Do not expose bare cables outs, all the battery terminals must be disconnected for
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Stack'd Series and is the answer not in the manual?

Questions and answers

Summary of Contents for HOMEGRID Stack'd Series

  • Page 1 HomeGrid Stack’d Series Installation Guide 1. Safety Precautions It is very important to read the user manual carefully before installing or using battery. Failure to do so or to follow any of the instructions or warnings in this document can result in electrical shock, serious injury, or death.
  • Page 2 Do not place in an area used by at a children or pets. Do not use cleaning solvents to clean battery. Do not expose battery to flammable or harsh chemicals or vapors. Do not paint any part of battery; include any internal or external components. Do not drop, deform, impact, or cut with a sharp object.
  • Page 3 Unpack Equipment Place Base in correct location Stack Battery Modules Remove black sticker on bottom of battery Module Stack battery Module onto Base – then remove both side covers per module Repeat with remaining modules Dial correct addresses on modules (1-8 with 1 being at the top and 8 being at the bottom)
  • Page 4 Dial Code Switch Position Address Definition Coding Set to the slave Pack1 Set to the slave Pack2 Set to the slave Pack 3 Set to the slave Pack 4 Set to the slave Pack 5 Set to the slave Pack 6 Set to the slave Pack 7 Set to the slave Pack 8 Turn on Modules...
  • Page 5 Connect to the Sol Ark Inverter Connect to Victron inverter Connect to the Growatt inverter Connect to the Sofar inverter Connect to the Solis inverter Connect to the Goodwe inverter Connect to the Sermatec inverter Connect to the Must inverter Connect to the GreenCell inverter...
  • Page 6 Set Controller address to “1” (see end of this guide for parallel installation) Inverter/Module Detection Protocol: Detect # of modules in system: Set all inverter switches on Controller (Main BMS) to “On” Power on Controller to detect # modules Controller display will then show the # of modules detected Power off Controller Detect Inverter Protocol: Set inverter switches to correct inverter being used (See chart below)
  • Page 7 Inverter Dial Code Switch Position Address Coding Definition Monitoring Software setting mode ZRGP Studer_Xtender Sofar_LV Solis_LV Goodwe_LV Victron_color_control SMA_LV Sermatec_LV Growatt_SPF Li_PLUS Schneider_Gateway SOL-ARK_LV Growatt_SPH&SPA GreenCell Must Find Address: used when more than one system is connected Detect the number of modules in a single Stack...
  • Page 8 Assemble the fixing brackets for the battery module into a long strip and mount them in the middle of the left-hand side of the system: Re-install all covers on Modules and Controller from bottom to top Complete (See next page for Parallel Installation)
  • Page 9 Parallel Installation Battery outputs/inverters should be connected to a BUS bar that is rated for total system in compliance with NEC. Ensure that the inverter’s battery breaker is in OFF position while performing parallel install. *Follow initial install procedure above for each individual Stack* Set Master address to 1, and each successive Slave to 2 ~ 15.
  • Page 10 Set to Pack13 Set to Pack 14 Set to Pack 15 Connect communications cables Use standard CAT5/Ethernet cable to connect system communications in parallel. Link-A port on Master to Link-B on Slave 1, Link-A port on Slave 1 to Link-B on Slave 2, etc. Once master and slaves are connected, and once the master is connected (via communications) to inverter, power on all slaves.