1 Scope/Application

This OHL Technique covers erection of H-poles using a Strimech.

2 Safety Information

Work shall be carried out in accordance with General Requirements in Section 1. Approved
mandatory PPE and work wear shall be in accordance with General Requirements in
Section 1.
The task covered by this OHL Technique has significant hazards associated with it identified
by the symbol and text CAUTION:
This OHL Technique details the risk control measures that must be applied when carrying out
the task. If the risk control measures in this procedure are implemented the risks will be
controlled. This OHL Technique also forms the method statement for the task.
CAUTION: Loss of control of a wood pole can result in serious injury or death. Take care to
ensure that poles are lifted, handled and moved correctly at all times.
CAUTION: Avoid skin contact with wood poles; wear approved gloves when handling wood poles. Refer to
the detailed information on creosote in Section 1.
CAUTION: Where poles are to be erected close to HV live lines, take precautions in accordance with CP423.
CAUTION: Ensure all personnel are clear of the backarm and pole during mechanical handling of the pole.
CAUTION: Before leaving the excavator, ensure the hydraulically operated parts of the excavator (i.e. the
feet, front bucket and jib) are on the ground. The purpose of this is to prevent death or serious injury to
personnel or damage to equipment caused by hydraulic or mechanical failure.

3 Personnel

The minimum team number for this task is six Competent Persons.

4 Preliminary Operations

Refer to Section 1 of this manual.
Issue 1
September 2020
ERECTION OF H-POLES
USING A STRIMECH
CP430 Part 1: Linesmen's Manual – Wood Pole and Mural Wiring
© Electricity North West 2020
(DEAD WORK)
Section 2
OHL
Technique
319
Page 1 of 5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the I-430P1-M319-001 and is the answer not in the manual?

Questions and answers

Summary of Contents for electricity noth west I-430P1-M319-001

  • Page 1 ERECTION OF H-POLES USING A STRIMECH Technique (DEAD WORK) 1 Scope/Application This OHL Technique covers erection of H-poles using a Strimech. 2 Safety Information Work shall be carried out in accordance with General Requirements in Section 1. Approved mandatory PPE and work wear shall be in accordance with General Requirements in Section 1.
  • Page 2 Flag stones 7 Pole Erection Refer to Drawing I-430P1-M319-001 and proceed as follows. 1. Ensure backboards have been fitted in accordance with OHL Technique 309. CAUTION: Do not enter an excavation deeper than 1.2 metres OR if the excavation is in danger of collapse unless adequate shuttering is in place.
  • Page 3 ERECTION OF H-POLES USING A STRIMECH Technique (DEAD WORK) 8. Adjust the rollers on the Strimech planter to suit the H-pole and position the Strimech planter under the poles ready for lifting. 9. Position a suitable winch, of adequate capacity, directly in line with the H-pole and attach a ground anchor.
  • Page 4 ERECTION OF H-POLES USING A STRIMECH Technique (DEAD WORK) Section 2 Issue 1 CP430 Part 1: Linesmen's Manual – Wood Pole and Mural Wiring Page 4 of 5 September 2020 © Electricity North West 2020...
  • Page 5 ERECTION OF H-POLES USING A STRIMECH Technique (DEAD WORK) Section 2 Issue 1 CP430 Part 1: Linesmen's Manual – Wood Pole and Mural Wiring Page 5 of 5 September 2020 © Electricity North West 2020...

Table of Contents