  • Page 1 Installation Instructions for the PowerFit20 Photovoltaic Modules...
  • Page 2 In order for the PowerFit20 to be properly installed, the width between the internal peaks of the seams must be no less than 15.5”. The PowerFit20 is only compatible with flat standing seam roofs. Any striations or other non-flat surfaces may prevent the module from adhering for the intended lifetime.
  • Page 3 Specs: 7.5’ long, 10 AWG PV wire with Consult your installer to determine the MC4 heads optimal inverter that will be compatible with the PowerFit20 system. Attached Description: Pre-cut MC4 PV cabling is a compatibility list for the AP Smart for connecting one pair of modules component suggested by Sunflare.
  • Page 4 • Always turn off and disconnect the inverter The PowerFit20 modules are not intended for or other loads before working on the system. installation by unqualified end users. These instructions are to be retained for future •...
  • Page 5: Fire Safety

    • Danger! Even though it is safe to walk on the blackout blankets on the entire string to PowerFit20, it could become dangerous if the remove voltage from the system and then (3) top surface has been damaged, degrading disconnect the target module. You may then the dielectric resistance of the module.
  • Page 6: Installation Safety

    Note, wind gusts can be responsible for proper support structure unpredictable and are not always preceded design. Sunflare is not responsible for by increased wind speeds. Care must be supporting structures, including but not taken to ensure modules are always safely limited to the roof structure.
  • Page 7: Mechanical Installation

    • Do not disassemble the modules or remove any nameplates, serial numbers, or The PowerFit20 module is certified by CSA as part of a Class A roofing system per UL 790 components from the modules. when installed over metal standing seam roofing systems when the following requirements are met: •...
  • Page 8: Module Installation

    Figure 2. Shows the adhesive on the back of the PowerFit20 module. Figure 1. Showing the adhesive on the wire conduit being installed on one side of the standing seam.
  • Page 9 Take another piece of the WMS wire conduit and line it up so that the bottom of the component on the downhill slope is even with the end of the second module. Remove the adhesive covering and apply pressure to install the component. Figure 4.
  • Page 10 Figure 7. Shows the 8” MC4 jumper cable installed Figure 9. Shows the full installation of (2) modules along with both ends of the 7.5’ MC4 jumper cable. along with the WMS components. The last component can now be installed with a Repeat this process until you have fully installed bead of DOW 804 adhesive sealant around the all modules on the seam before moving onto...
  • Page 11 When connecting the AP Smart component, it is important to understand the limitations with the PowerFit20 modules. No more than (6) modules should be connected in series to one AP Smart component. Doing any more will result in failure of the PV system.
  • Page 12: Electrical Installation

    Doing so might damage Whenever possible use the jumper cables the roof surface. provided by Sunflare. They are cut to the correct size and have the proper mating connectors for If service or inspection is required, disconnect the the modules.
  • Page 13: Liability Limitation

    Liability Limitation Physical Dimensions Sunflare is not in control of the installation of the All dimensions have a tolerance of +/- 2 mm module and hence does not accept responsibility nor liability for damages arising from improper 354.0±2 mm use, incorrect installation, operation, or [13.9±0.1 in]...