Page 2
Q t y . S.No P a rt N ame B urie d wal l box Upp e r c ov e r ( with l evel) M 5 * 4 0 h e x a g o n s o c k e t h e a d c a p s c r e w P a n el as semb ly Se t sc re w P lugs...
Preparation before installation Drain tank 3 Drain tank 1 Water tank 2 COLD To install a single-function Recommended opening shower, hit a sink (outlet sink size: Figure a is the length 3). To install a two-function and width of the hole, shower, use two outlets (outlet Figure b shows the depth 1 and outlet 2).
Page 4
Level Water tank 2 Drain tank 1 COLD Secure the box to the wall with 4 Connecting hot and cold inlet and expansion screws and tighten with the outlet pipes Note: Before connecting, please wrench, and make sure the box is turn on the water source first, parallel to the wall;...
Page 5
Sealed wall The effect of cement filling. . After rinsing and ensuring that there is no leakage inside, fill the surrounding wall with cement. Stick the tiles and the tiles should match the edges of the box. After the tile is finished, wait for the panel to be installed.
Page 6
Mounting panel To close the water source, first loosen the two The tile plane is flush, the excess of the hex nuts counterclockwise with the HF005 buried wall box is cut off, and the glass horseshoe sleeve (12), then use the tool (11) to ring is coated on the entire circle of the unscrew the three screws (3) and remove the box and the wall.
Page 7
Mounting member (4) panel assembly as shown Install the handle (7), use the tool (9) to install the parts (5), (6) on the handle in turn, and make sure the handle is securely installed.
Page 8
The effect diagram after the installation is completed is shown in the figure above. INM-ZEP-412/413-CP-8-18...
Need help?
Do you have a question about the ZEPHYR and is the answer not in the manual?
Questions and answers