Eversola ES-M-Abcp Series Installation & Maintenance

Advertisement

Quick Links

Eversola LuoYang Co., Ltd.
nd
No.8, 2
Jinye Road, Jinping Town, Yiyang County, Luoyang City,
Henan Province, 471600, P.R. China
Eversola Jiangsu Co., Ltd.
No.69 Kanghua Road,Economic and technological development zone,Hai'an City,
Jiangsu Province, 226600, P.R. China
Customer Service hot line:
+86 379 68951871(HQ)
Fax:
+86 379 68951871(HQ)
Email:
services@eversola.com(HQ)
Web: www.eversola.com
Ref. : LYHT-INSTALLATION MANUAL
All Rights Reserved by Eversola LuoYang Co., Ltd.
Ref. : LYHT-INSTLLATION MANUAL Version :OR Updated on : 2021-06
Version : OR Updated on : 2021-06

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ES-M-Abcp Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Eversola ES-M-Abcp Series

  • Page 1 No.69 Kanghua Road,Economic and technological development zone,Hai‘an City, Jiangsu Province, 226600, P.R. China Customer Service hot line: +86 379 68951871(HQ) Fax: +86 379 68951871(HQ) Email: services@eversola.com(HQ) All Rights Reserved by Eversola LuoYang Co., Ltd. Web: www.eversola.com Ref. : LYHT-INSTLLATION MANUAL Version :OR Updated on : 2021-06...
  • Page 2 Contents Disclaimer of Liability Preface Product Identification Safety Transportation and Handling Installation Maintenance Annual Inspection Applicable Law and Dispute Settlement All Rights Reserved by Eversola LuoYang Co., Ltd. Ref. : LYHT-INSTALLATION MANUAL Version :OR Updated on : 2021-06 ·01·...
  • Page 3 (including without limitation patent, copyright and trademark) or other rights of Eversola, Whether expressly or impliedly, is granted to customers because of Barcode: the barcode is located in the inside the glass the module, and contains use of modules.
  • Page 4 6. Do not touch exposed parts, cables or connectors. 7. Do not dismantle, disassemble or modify any parts of the modules and do not remove or alter in anyway the labels or markings on modules. 8. Do not step or walk on the modules. Doing so may damage and crack parts of modules.
  • Page 5 C and 14-20 N*m for M8 (diameter is 8mm) screw in installation holes southern hemisphere modules orientated to the north. A&B. Notify Eversola of any damage to product immediately. Do not use or install damaged modules. Damaged modules may cause fire or electric shock, resulting in property damage, fire and or death.
  • Page 6 For A series modules, four clamps must be used: Inserting System: Fix the module with U type groove or flange beam. All available installation methods for A series modules (Figure 9) For other series module, fix the module with the long sides or short sides according to the bracket design and mechanical load requirement.
  • Page 7 The minimum separation between two modules shall be more than 10mm; when It is better to use the modules with same specifications same color when installing on the roof, the recommended separation between the modules and the connected in series. roof surface is 100mm to allow for air flow around the modules.
  • Page 8 This document constitutes part of the contract and valid automatically when the contract is signed. All Rights Reserved by Eversola LuoYang Co., Ltd. Ref. : LYHT-INSTALLATION MANUAL Version :OR Updated on : 2021-06...

This manual is also suitable for:

Es-m-agcd seriesEs-m-24/abpw seriesEs-p-24/abpw seriesEs-m-bgcd seriesEs-m-24/bbpwEs-p-24/bbpw series ... Show all

Table of Contents