Operation Guide AIRSCREEN classic
Read these installation instructions carefully BEFORE attempting to install your
AIRSCREEN.
FAILURE TO FOLLOW THESE INSTRUCTIONS OR MISUSE OF THIS
PRODUCT MAY CAUSE DAMAGE, INJURY OR DEATH.
Before inflation, make sure that all items and personnel required to complete the
installation safely are available.
Adhering to the procedures set out in this guide will ensure a safe and successful
installation.
GENERAL GUIDELINES
• The AIRSCREEN can be operated safely in wind speeds up to 25 mph (40 km/h).
• The site where the AIRSCREEN is installed must be level.
• Cordon off the area where you are placing your AIRSCREEN and do not allow
members of the public within this area.
• Audience must be at least the height of the frame away from the frame.
• If the system is being used at an event over several days, deflate the system at the
end of each screening and cover.
• Screen should not be left unattended while inflated.
• A tarp is required to put between the AIRSCREEN and the ground to protect frame
and screen from dirt and sharp objects such as broken glass, sharp stones, etc.
GENERAL SPECIFICATIONS
• AIRSCREEN is made from heavy duty PVC of welded construction with reinforced
anchor points. Screens surfaces are cinema quality projection surfaces.
The following items are included with your AIRSCREEN:
1. Frame
2. Screen Surface
3. Straps/Ropes*
4. Screen bungee ties (for attaching screen to frame)
5. High-pressure blower
6. Manual
*Weights (water barrels, concrete blocks, etc.) are necessary. These must be obtained
by the user.
I. ASSEMBLING YOUR AIRSCREEN
1
Need help?
Do you have a question about the AEROPRO and is the answer not in the manual?
Questions and answers