UNIT ASSEMBLY
- LOCATE THE BASE PLATE AND STAND IT UP ON ITS SIDE.
- THREAD THE 3/8-16 x 2" BOLTS THROUGH THE BASE PLATE HOLES.
LIGHTLY HAND TIGHTEN 3/8-15" NUTS, SO THAT BOLTS REMAIN IN PLACE
WHEN LAID FLAT ON GROUND.
- LAY BASE PLATE DOWN FLAT WITH THREADS FACING UPWARD. REMOVE
NUTS
BRDG
BRDG
9
BRIDGE ST UDIOS