G-550
INSTALLATION & MAINTENANCE
PREPARE FOR INSTALLATION
1. Locate the packing slip(s) and shop drawings.
2. Verify that all products listed on the packing slip are included in the package.
3. Check the products for damage. If products are damaged, report a freight claim immediately and leave
the products in their packaging. If you sign for products without reporting damage you waive your right
to a freight claim and will be responsible for their replacement cost.
4. Read the instructions thoroughly before beginning installation.
PREPARE THE RECESS
A flat recess and accurately installed frames are critical to the overall performance of the mat. Utilize a self-
leveling compound (provide by others) if necessary to ensure a level recess,
1. The rough opening for the frame should be at least 3 inch deep and at least the width and length of the
frame. This allows room to maneuver the frame and provides clearance for the anchor bolts.
2. Verify that the bottom of the recess is flat within 1/8 inch over 10'. The recess must be flat to prevent
damage to the mat. Utilize a self-leveling compound (provide by others) if necessary to ensure a level
floor surface.
ASSEMBLE THE FRAMES
Frames that exceed 96 inch in either width or traffic direction are shipped in separate pieces.
1. Assemble the frame sections according to the shop drawings. Splice plates and pins are provided for
connecting frame pieces together.
a. Cross supports are attached to the perimeter frame using the 1/4-20 by 1 inch self-threading
screws.
b. Cross support is spliced together using splice pins.
c. Perimeter frame is spliced together using splice plate
2. Insert the 1/4 inch by 2 inch anchor bolts, hex nut and wing nuts at the pre-drilled holes on the bottom
leg of the frame