Sign In
Upload
Download
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Dobrosfera Manuals
Construction Equipment
Z10H
Assembly instructions manual
Dobrosfera Z10H Assembly Instructions Manual
Hide thumbs
1
2
3
4
5
6
7
8
9
10
11
12
13
page
of
13
Go
/
13
Bookmarks
Advertisement
Quick Links
Download this manual
Z10H
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Need help?
Do you have a question about the Z10H and is the answer not in the manual?
Ask a question
Questions and answers
Summary of Contents for Dobrosfera Z10H
Page 1
Z10H...
Page 2
© Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 3: Delivery Set
A foundation piles, foundation frame, floor lags, flooring beams, supports and anchorages of the lags of the second floor are not included in the delivery set. © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 4
The frame must be fixed on metal plates on top of the pile with a bolt screw from below through the head to the vertical beam with preliminary drilling with a depth of 120-150 mm. © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 5
For work at a height, use only specialized auxiliary equipment. Be sure to use a construction helmet, insurance and assistants. If you are not sure in your abilities, recruit specialists for installation. © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 6
Foundation - screw piles It is possible to use a band or monolithic foundation; combining of perimeter piles and concrete support in the center; other types of foundations. © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 7
Foundation frame and lags of the first floor The lags of floor and the beams of foundation frame are not included in the delivery set, they are locally manufactured from dry lumber. © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 8
M12 bolt with a nut and wide washers on both sides. A total of 4 bolts per each nagel. © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 9
Mounting of the support disk © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 10
Assembly of units © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 11
Fixing lining are made of PSF plywood thickness of 20 mm. We recommend to leave a sufficient second light to organize the stairs and maximum aesthetics of the construction. © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 12
- otherwise it will damage the roof! Sheathing is not included in the delivery set and it is manufactured independently. © Factory « D obrosfera » , 2018. Version 3.0 us.dobrosfera.com...
Page 13: Important Notes
(wood) arising from improper storage or operation is not a warranty case. Reference information The table shows the characteristics of the constructor Dobrosfera Z10H for an approximate calculation of the estimate. №...
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the Z10H and is the answer not in the manual?
Questions and answers