ROUTED – PICKET & HAWTHORNE FENCE INSTALLATION INSTRUCTIONS
These instructions are to be used as general
guidelines for the installation of your vinyl fence
under normal installation conditions. Local
conditions may exist which may require changes
in the recommended methods of installation
noted in these instructions such as extreme
weather, bad soil conditions such as expansive
soil or poorly compacted soil, extreme winds or
heat, etc.
1.
Before you begin, familiarize yourself with
the installation instructions.
2.

Tools Required for Installation:

a) Measuring tape
b) Wood or Metal Stakes
c) Post-hole digger / auger
d) Post-mix concrete
e) String
f) Hammer
g) Shovel
h) Spray paint
i)
Wheelbarrow
j)
Level
k) Duct tape to seal rail ends
l)
Saw
m) Drill
n) Wrenches (adjust gate)
3.
KNOW WHAT'S BELOW BEFORE YOU
DIG! Most areas have a call center that you
can call to have the utilities located prior to
digging. Calling your local utility company is
the easiest way to determine who to call. It
is important to note that most utility
companies will not locate and mark private
utility lines that were installed by
homeowners or contractors. Locating utility
lines prior to digging may not only save your
life, it may also release you of liability in
many cases if a line is hit during installation
that should have been located but was not.
Prior to digging the holes, you should be
prepared with emergency numbers to call in
the event that a utility line is damaged.
4.

FENCE LAYOUT:

When you purchased the fence you likely drew a
layout and determined the amount of fencing
www.almarvinyl.ca • sales@almarvinyl.ca
you needed. It is very helpful to draw the layout
of the fence prior to purchasing and installing
your vinyl fence.
Once you have drawn the fence layout (sample
above) and received your product, it is time to
mark the locations to dig the holes for the posts.
To start, hammer a stake at each corner and
end location of your fence. Pull a string line
between the end and corner posts. This string
line represents where the center of your fence
will be. Many people offset the string line at this
time so that it represents the edge of the fence
line; this will save an extra step when you begin
setting the posts (see Figure 1.1).
Determine gate post locations and set stakes at
these locations. Once you have pulled the string
line tight you can now mark the center of each
post along the string line.
Mark the post hole location by beginning at one
end of the fence and marking the center to
center measurement of each post (your center
to center measurement can be found on the
specification sheet of the style fence
purchased). For example, if you have a 96½" on
center section, you will measure from the center
of your first post 96½" and mark the ground with
upside down marking paint. Continue marking
down the string line until you get to the end post.
See (Figure 1.1).
Page 1 of 6
Effective: 2/29/2016
Exeter, Ontario (888) 644-2844

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ROUTED - PICKET & HAWTHORNE and is the answer not in the manual?

Questions and answers

Summary of Contents for AL-MAR ROUTED - PICKET & HAWTHORNE

  • Page 1 Effective: 2/29/2016 www.almarvinyl.ca • sales@almarvinyl.ca Exeter, Ontario (888) 644-2844 ROUTED – PICKET & HAWTHORNE FENCE INSTALLATION INSTRUCTIONS These instructions are to be used as general you needed. It is very helpful to draw the layout guidelines for the installation of your vinyl fence of the fence prior to purchasing and installing under normal installation conditions.
  • Page 2 Note: Different soil conditions and climates require different footing requirements. Seek guidance from local professionals and building codes to determine the proper depth and width of footing. In many areas, a 10” wide hole for a 5” post with a depth of 36-42” is standard and adequate but different regions and local codes vary.
  • Page 3 Once the holes are dug, the easiest way to set Note: At the end of the runs, sections may need posts in a straight line is by using a string line to be shortened to maintain desired layout. stretched from one end of the fence to the other. To do this, move the stakes you previously used Help Tip: It is important to look often down the to mark the hole locations over 2”...
  • Page 4 The posts can also be set the right height by INSTALLING THE BOTTOM RAILS placing the bottom rails in the posts and using a Insert the bottom rail into the post, maintaining level to make sure the posts are set level. When an equal distance on both sides of the rail.
  • Page 5 INSTALLING THE TOP RAILS Slide the top rail into place as shown in Figure 1.10 Figure 1.10 GATE INSTALLATION INSTRUCTIONS There are many methods of making gate posts stronger such as adding steel inserts and or concrete to the inside of gate posts. We prefer the method of adding 2 - ½”...
  • Page 6 WARNING! Once the concrete has cured, the gate can be If filling 2 adjacent posts with concrete, a drain attached to the hardware by adjusting the hinges MUST be drilled in bottom rail (through all to the desired gate width and holding or blocking internal ribs &...

Table of Contents