BASEMENT SUMP AND PUMP SYSTEM
Installation and Operation Guidelines
Page | 1

Advertisement

loading

Summary of Contents for Permagard PermaSEAL

  • Page 1 BASEMENT SUMP AND PUMP SYSTEM Installation and Operation Guidelines Page | 1...
  • Page 2: Table Of Contents

    Contents 1. Product Summary 2. Installation Guidelines 3. Technical Specification 4. Dimensions 5. Parts List 6. Maintenance 7. Health and Safety 8. Guarantee Page | 2...
  • Page 3: Product Summary

    Monday to Friday. 1. The PermaSEAL Basement Sump and Pump system is only supplied with the waste outlet pre drilled. The water inlet(s) and also the electrical conduits will need to be located and drilled before or during the installation of the sump.
  • Page 4 6. Connecting the internal pipework and the waste outlet: The PermaSEAL Basement Sump and Pump System is supplied with all of the internal pipe work required to connect the pump(s) to the external waste outlet. Firstly we suggest the pump(s) are set up with the waste pipework, float arms and alarm outside of the sump chamber to ensure correct fitting.
  • Page 5 For the dual pump system please follow this set up: Fig 2 The dual pump system is designed to have one pump as the master pump and the second as a backup in case of master pump failure or a sudden water in rush above and beyond the normal volume expected. It is important to designate the master and backup pump at this point.
  • Page 6 5. It is above this point that the activation of the backup pump is set. Normally it is left as the highest setting on the float arm. (see fig 2) The system activation process is as follows: Water enters chamber > master pump activates > high water level alarm activates > backup pump activates. The activation setting levels may need to be finely tuned when the pumps are in the chamber and water levels can be tested.
  • Page 7 We recommend that the discharge pipe work is 50mm solvent welded Class E PVC pressure pipe. To connect the discharge pipe work to the discharge spigot on the tank you must firstly screw on the Plain/Threaded PVC Socket (supplied already attached) onto the spigot which will then leave you with a plain socket to solvent weld your discharge pipe work into.
  • Page 8: Technical Specification

    3.0 CP250 Pump Technical Specification Model CP250 Power Supply 230V AC Motor Rating 250W Pump Dimensions L190 x W140 x H360 (mm) Max Vertical Output Max Flow Rate (LPM) Max Liquid Temp. <50°C Rated Head (m) Rated Flow (LPM) Discharge Size 1 ½”...
  • Page 9: Maintenance

    6.0 Maintenance The PermaSEAL Basement Sump and Pump System requires minimal maintenance, however it is strongly recommended that the unit is serviced quarterly during the first year. It is essential that the unit is serviced at least annually thereafter. To clean out the unit you must first turn off the power supply and ensure that it cannot be inadvertently turned back on (i.e.
  • Page 10: Guarantee