INSTRUCTION FOR USE

3 INSTALLATION

3.1 GENERAL NOTES AT THE DELIVERY

Upon receipt of the machine check that:
Any packaging is intact.
There are no damaged parts.
In the case of damage or missing parts, inform immediately in detail (possibly with photos)
Automator International srl or distributor
Together with the present instruction manual. there are also the following documents
- Drawings
- Declaration of integration
The equipment supplied and any spare parts / components of the equipment must be
properly kept by the head of maintenance.

3.2 INSTALLATION PROCEDURES

Installation operations must be carried out by skilled, trained people, in total security
Once removed the tape that fix the lid, open
the box from the top and place the machine
on an horizontal support
With
such
point
of
guarantees the balance of the machine
during the transport to the final destination.
Different points of engagement can cause
imbalance of the mass, with possible
dangers to people and with possible damage
to the machine
The machine
has been projected
constructed so that its stability - prescribed
Fax 02 48601503 e-mail info@automator.com www.automator.com
e-mail info@automator. Com www.automator.com
Machine:
e-mail info@automator. Com www.automator.com
VP UNITS
engagement,
one
and
Code:
MAN MBVPREV3
Del: 03/2012
Ediz.n: 4
Edited by: U.T. VB
Appr. by:
.
1.1.1.1.1.1
Pag. 14/26
RB.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MB19VP and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Mb19vpnMb21vpMb35vp

Table of Contents