2 Installations Instructions

2.1 General:

The product must be installed by a person who has the professional knowledge
required to perform the installation correctly. Unless the installation is
performed by a professional, the insurance companies may claim that the
insurance does not cover any damage that has occurred and that the offers made
by the insurance companies to the property owner are invalid. The products are
marked with a label stating the article number and date of manufacture.

2.2 Installation:

Motorised Ball Valves: (art.no. 2130051 if DN15 is used)
The units are intended for tap water, 0-60°C and 0-10 bar.
The ball valves are mounted on the incoming cold and hot water to the
monitored space and connected to the control unit via cable. They can
be mounted horizontally, vertically, or upside down and regardless of the flow
direction. The unit has an internal R-thread. Connect them to pipes, for example
with compression fittings. Use the required sealant.
The units must not be mounted in a concealed place; they must be placed so that
they are replaceable and so that any leaking water can be easily detected. The
units must be installed in rooms with a waterproof floor, in a distribution cabinet,
or in a custom space. If a distribution cabinet is used, the installation instructions
for this must be followed. After mounting, the installation must be checked for
leaks with the tap water installation's existing water pressure according to the
instructions on www.säkervatten.se
The Control Unit: (art. no. 2220111)
Mount in a suitable place near the space which will be monitored. The
cable from the presence detector (230 vac) is connected on one side
of the control unit and the cables to the motorised ball valves (12vdc)
on the other side. The wiring from the motorised ball valves and the
presence detector is drawn to the control unit and connected to the K2
6-pole terminal block with the red cable to +. Up to three motorised ball valves
can be mounted on each control unit. Each ball valve has its own position on the
terminal block but are controlled in parallel.