Naficon NAF1000 Installation Manual

Cross-connection cabinet

Advertisement

Quick Links

NAF1000 CROSS-
CONNECTION
CABINET
INSTALLATION
MANUAL

Advertisement

loading

Summary of Contents for Naficon NAF1000

  • Page 1 NAF1000 CROSS- CONNECTION CABINET INSTALLATION MANUAL...
  • Page 2: Cabinet Installation

    Cabinet installation NAF1000 cabinets are delivered individually on pallets. At the installation site, move the cabinet into place. When the cabinet is in the correct position, the feet are adjusted so that the cabinet is in a straight position. Make sure the cabinet is level. It is a good idea to use the floor mounting kit, that comes with the cabinet, be sure that the cabinet is maintained in the right place.
  • Page 3 16 mm² and connect the grounding cable to the grounding bar. 3. Terminating cables in the cabinet The termination of cables to the NAF1000 cabinet can be done in two ways: Splicing to the pigtail cables are done on a splice tray, which is mounted on the splice tray holder inside the cross-connection cabinet.
  • Page 4 The ends of the cables are brought through the lower part of the cabinet to the front of the cabinet, where the peeling of the cables and splicing is carried out. The splicing is done to the ready-assembled NAF1000 pigtail cables. The cables are brought into the cabinet in the following stages: •...
  • Page 5 3.3.1.1 Multi loose tube (MLT) cables • Cut the cable jacket at the cable peeling point. • Remove the jacket from the end of the cable for about 10 cm and locate the tear-off wires. • Split the cable jacket up to the peeling point plus about 30 mm, using the tear-off wires and cut the halves of the jacket at the cable peeling point.
  • Page 6 Mark the ends of fiber tubes with numbers. Placing the fibers on the splice tray • Remove the cover and the protective tape from it. • Measure the fiber lengths on the splice tray. The fibers needed for Naficon's universal splice trays are about 120cm.
  • Page 7 • If you are using Naficon's universal splice trays, rotate the fiber bundles for the two upper splice protection sleeves by using the whole splice tray and take them from the left side to the splice protection sleeves.
  • Page 8 Installation of NAF1000 pigtail cables 4.1 Installation of NAF1000 ready assembled module Install the cage nuts, leaving the top opening empty. Open the coil of the tail cable and straighten it. Be sure to make the necessary markings on the cable. The cable comes with serial number and length markings.
  • Page 9 Peel the fiber tubes to approx. 6cm in length, remove the gel. • If you are using Naficon's universal splice trays, rotate the fiber bundles for the two upper splice protection sleeves by using the whole splice tray and take them from the right...
  • Page 10 • The bundles to the lower two splice protection sleeves are first rotated from the middle of the tray to the other side of the tray, then around the whole tray and finally from the left side to the splice protection sleeves. •...