Download Print this page

Gazebo Junction Aluminum Gazebo Kit Installation Instructions Manual

Advertisement

Quick Links

[Type text]
Thank you for purchasing our Aluminum Gazebo Kit! We have taken great time and care in designing a
high-quality product that will last for years with little set-up and maintenance. Our gazebos come with pre-
fabricated modular walls and pre-cut components to minimize the time necessary for assembly and
installation. Please follow these instructions in the assembly and completion of your gazebo to ensure a
finished project that will look beautiful and provide years of enjoyment.
NOTE:
Dealer or homeowner is responsible for providing a proper deck, foundation, or slab to which the
gazebo may be secured. Your gazebo is designed to be a free-standing structure secured only to a deck,
foundation, or slab. Gazebo Junction, Inc. accepts no responsibility for damage caused to the gazebo or
other property by faulty foundation or installation.
CAUTION:
Do not attempt to assemble and install your gazebo in wind conditions of more than 12 mph.
In windy conditions the modules, and roof panels are difficult to handle and could result in damage. Also,
it becomes difficult to achieve and maintain the proper verticality of the corner posts during installation.
NOTE: The Solid Roof does not include drip edge, roof felt, or shingles necessary for a shingled
appearance. You can purchase these materials of your choosing at your local building products supplier
in order to get the proper color and texture you desire. Material quantities can be found in section "F" as
part of the solid roof installation instructions.
Estimated Time Requirements:
are required for assembly; more may be required for installation of the solid roof, especially on large-size models)
Wall System Assembly:
Solid Roof Installation:
Shingling (solid roof):
Installation Outline:
A. Recommended Tool List.
B. Deck or slab preparation.
C. Base Channel Installation.
D. Wall Module Installation.
E. Top Cap Installation.
F. Solid Roof Installation.
G. Door Installation.
Dimensions:
Please see Appendix A for model drawings and approximate dimensions.
Assembly Overview
The following time estimates are based on 2 people
2-4 hours
depending on size
4-6 hours
depending on model type and size
4-8 hours
depending on size
1
1-800-966-9261
(at least 2 people
.
Rev. 6/1/07

Advertisement

loading

Summary of Contents for Gazebo Junction Aluminum Gazebo Kit

  • Page 1 [Type text] 1-800-966-9261 Thank you for purchasing our Aluminum Gazebo Kit! We have taken great time and care in designing a high-quality product that will last for years with little set-up and maintenance. Our gazebos come with pre- fabricated modular walls and pre-cut components to minimize the time necessary for assembly and installation.
  • Page 2: Recommended Tool List

    [Type text] 1-800-966-9261 A. Recommended Tool List -Tape Measure -7/16” Socket Additional Tools Required for Solid Roof: -Phillips Screwdriver -1/4” Hex Driver or Bit -Power Drill/Driver -7/16” Hex Driver or Bit -Rubber Mallet -1/8” Drill Bit -Level -Tin Snips -5/16” Drill Bit -Square Drive Bit (included) -2 Ladders...
  • Page 3: Top Cap Installation

    [Type text] 1-800-966-9261 D. Wall Module Installation Wall modules come pre-assembled and pre-screened to simplify installation. CAUTION: Take care while unpacking and assembling the wall modules to avoid putting holes or rips in the fiberglass screen. However, should one or more modules need re-screening, the rubber screen spline is easily removed and re- used.
  • Page 4 [Type text] 1-800-966-9261 Check wall modules and corner posts to ensure they stay vertical. Secure each top cap piece with four (4) 3/4” self-tappers, both inside and outside, similar to the screw locations on the base channel. Be sure the top cap has been fully secured before moving to the roof installation.
  • Page 5 [Type text] 1-800-966-9261 Other sealants may destroy foam in roof panels.) Repeat this operation with all eight sections. Before lifting the roof sections into place, you will need to install two wood screws as shown in Fig. 3.2 to hold panels together as they are being lifted into place.
  • Page 6 [Type text] 1-800-966-9261 Rev. 6/1/07...
  • Page 7: Door Installation

    [Type text] 1-800-966-9261 Roof Ridge Cap (Optional) Shingles Shingles Drip Edge (Sq. Feet) (Linear Feet) (Linear Feet) Octagon Oval 8' x 12' 10' x 14' 12' x 16' 14' x 18' 16' x 20' G. Door Installation Follow the instructions included with the door and door hardware to mount and finish the door.