Advertisement

Quick Links

Comp Kit
Installation Manual
13
13
HEX
HEX
mm
One Tool System
© 2018 SOLARACK INC. VR2.1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SR-COMP and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SOLARACK SR-COMP

  • Page 1 Comp Kit Installation Manual One Tool System © 2018 SOLARACK INC. VR2.1...
  • Page 2: Table Of Contents

    Page 14 Comp Kit - Components Page 14 Water Deflector Page 14 Required Tools and Torque Values Page 16-17 Installation Manual Page 17-21 Micro Bolt Installation Manual Page 22-23 Warranty Page 24 © 2018 SOLARACK INC. VR2.1 Page 1 www.solarackusa.com...
  • Page 3: Check List

    Before Installation, Please Review the Following Checklist ● Ensure that SolaRack® is compliant with your module manufacturer. ● Ensure compliance with any clearances required by your local fire department of building & safety code. ● Ensure your work complies with na onal, tate and local requirements - Even those that may supersede this manual.
  • Page 4: SolarackĀ® Components

    ECO END CAP STRD END CAP HD END CAP Material: PVC Material: PVC Material: PVC Finish: n/a Finish: n/a Finish: n/a SKU: SR-ECO-END SKU: SR-STRD-END SKU: SR-HD-END © 2018 SOLARACK INC. VR2.1 Page 4 www.solarackusa.com...
  • Page 5 STONE COATED METAL DOUBLE STONE COATED METAL Material: SUS304/ AL 6000/1000 Series Material: US304/ AL 6000/1000 Series Finish: Anodized Clear Finish: Anodized Clear SKU: IGB-SR-SCM SKU: IGB-SR-DSCM © 2018 SOLARACK INC. VR2.1 Page 4 www.solarackusa.com...
  • Page 6 3/8 HEX BOLT & NUT Material: Aluminum AL 6000 Series Material: Aluminum AL 6000 Series Finish: Anodized Clear or Black Finish: Anodized Clear or Black Item Number: IGB-SR-2.0MCR Item Number: IGB-SR-2.0MCR © 2018 SOLARACK INC. VR2.1 Page 5 www.solarackusa.com...
  • Page 7: Marking

    All SolaRack ECO, STANDARD, & HD Rails are marked with the following label Grounding Nut’s UL 2703 Stamped on SolaRack® Mid & End Clamps Channel nut and Micro Nut. Item # SR-UMGE / SR-UMGM / IGB-SR-MICRO Grounding Lug Stamped on ILSCO SGB-4 Grounding Lug ©...
  • Page 8: Recomended Spacing

    - Roof Rafter shingle material. The SolaRack® Comp Kit is optimally spaced based on local city code and the rail system used. For measurements related to clearances and roof setbacks, please refer to your local building and safety office or other authorities having jurisdiction.
  • Page 9: Grounding & Electrical Diagram

    SolaRack Rail: ECO, STRD, HD Under Module Grounding Mid Clamp Under Module Grounding End Clamp ILSCO SGB-4 Ground Lug IGB-SR-MICRO, Micro attachment Bolt ECO, STRD, HD Grounding Splice Kit Fault Current Ground Path Minimum 10 AWG Copper Wire © 2018 SOLARACK INC. VR2.1 Page 8 www.solarackusa.com...
  • Page 10: Qualified Pv Frames

    "ZZ" can be KI, MI, MF, MG, SG, RI, RG(BF), RG(BK), TI, or TG Modules with 40mm frames and model identifier IT-xxx-YY; where "YY" is blank, HE, or SE, Iteck or Se72. © 2018 SOLARACK INC. VR2.1 Page 9 www.solarackusa.com...
  • Page 11 Modules with 40mm frames and model identifier SNxxxY-ZZ; where "Y" is M or P; and "ZZ" is S-Energy 10, or 15. Modules with 38mm frames and model identifier SYY-Z-xxx; where “YY” is SA or LA; SG or Silfab LG; and “Z” is M, P, or X. © 2018 SOLARACK INC. VR2.1 Page 10 www.solarackusa.com...
  • Page 12 Pa05, PC05, PD05, PA14, PC14, PD14, PE14, or DD05; and “ZZ” is blank, A, A.05, A.08, Trina A.10, A.18, .05, .08, .10, .18, .08D, .18D, 0.82, A.082(II), .002, .00S, 05S, 08S, A(II), A.08(II), A.05(II), A.10(II), orA.18(II). Yingli Panda, YGE, and YGE-U series modules with 35, 40mm frames. © 2018 SOLARACK INC. VR2.1 Page 11 www.solarackusa.com...
  • Page 13: Ul Requirements & Guidelines

    Please read carefully and follow the following guidelines and standards set by UL to comply with the ETL certification issued. SolaRack® is certified by ETL for the following listing: UL STD 1703 Fire Rating & UL STD 2703 Grounding and Bonding. The components evaluated for grounding and bonding that has passed received the UL STD 2703 by ETL are as follow: - SolaRack®...
  • Page 14: Universal Mid & End Clamp

    Under Module Grounding Nut Grounding Nut Detail Sectional Drawing UMG End Clamp Solar Module Frame Comp Flashing Roofing Surface SolaRack ECO, STRD, HD Rails SolaRack’s T-Bolt 5/16” x 3” SUS304 Lag Screw © 2018 SOLARACK INC. VR2.1 Page 13 www.solarackusa.com...
  • Page 15: Design Code References

    • Tilt Angles Considered: 0 to 30 degrees • Performance Not Limited to Deflection • Adequacy of Attachments Based on Evaluation Report This photovoltaic system is to be installed in accordance with the National Electrical Code, ANSI/NFPA70 © 2018 SOLARACK INC. VR2.1 Page 14 www.solarackusa.com...
  • Page 16: Water Deflector

    12” x 9” Aluminum Flashing AL1070 UV Rated Silicon Washer 5/16” x 3” SUS Lag Screw Water Deflector SUS304 T-Bolt and Nut. SolaRack® Flashing Water De lector © 2018 SOLARACK INC. VR2.1 Page 15 www.solarackusa.com...
  • Page 17: Required Tools And Torque Values

    Tape Measure Cordless Impact Torque Wrench Circular Saw (for lag screw only) (with aluminum blade to cut rail edge) 11mm Hex Socket 13mm Hex Socket 1/4” Wood Drill Bit (for ILSCO SGB-4) © 2018 SOLARACK INC. VR2.1 Page 16 www.solarackusa.com...
  • Page 18: Installation Manual

    Roof must be in good condition prior to installation.(condition of roof is to be verified and determined by the contractor / installer and SolaRack doesn't take any responsibility of determining the quality of the roof prior installation).
  • Page 19 Step 2 Insert SolaRack Flashing under the shingles as far as possible. Flashing shall not overhang a down slope shingles or a gap in shingle material. Place the V water deflection below the next shingle DO NOT cover it. Place the L-foot and the Silicon Washer over the flashing and align the L-Foot...
  • Page 20 Use the Integrated Grounding & Bonding splice kit at all connections between two rails. Maximum distance from L-Foot is no more then 36” from each side of the Splice Kit Torque to 10 ft lb. © 2018 SOLARACK INC. VR2.1 Page 19 www.solarackusa.com...
  • Page 21 Bottom Grounding Top Grounding Step 7 Insert SolaRack Integrated Grounding & Bonding UMG End Clamp by sliding it into the rail upper opening. Make sure the lip at the front of the End Clamp is placed below the Module frame.
  • Page 22 Tighten each bolt to 35 in-lbs as recommended by ILSCO. Acceptable wire size is 4-14SOL-STR. Suitable for use with either copper or aluminum. Size of grounding wire will be determined by electrical code. © 2018 SOLARACK INC. VR2.1 Page 21 www.solarackusa.com...
  • Page 23: Micro Bolt Installation Manual

    - Micro Attachment Step 2 Slide The Micro Inverter / Optimizer into place, make sure the washer is on top of the Micro Inverter / Optimizer Plate. - Micro Attachment © 2018 SOLARACK INC. VR2.1 Page 22 www.solarackusa.com...
  • Page 24 Step 3 Tighte the Micro Bolt to secure the Micro Inverter / Optimizer in place, Torque to 20 ft lb. -Optimizer (Solaredge) © 2018 SOLARACK INC. VR2.1 Page 23 www.solarackusa.com...
  • Page 25: Warranty

    SolaRack Limited Warranty document. Change in ownership of the Products or assignment of this Limited Warranty will not cause the warranty periods above to reset. Except as set forth above, SolaRack® sell products on “AS IS” basis, which may not be free of errors or defects, AND ALL EXPRESS OR IMPLIED REPRESENTATION AND...

Table of Contents