Download Print this page

Sunshine GardenHouse GKP68 Assembly Instructions Manual

Mt. hood 6' x 8'

Advertisement

Quick Links

Mt. Hood 6' x 8'
Assembly Instructions
Model GKP68

Advertisement

loading
Need help?

Need help?

Do you have a question about the GKP68 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sunshine GardenHouse GKP68

  • Page 1 Mt. Hood 6’ x 8’ Assembly Instructions Model GKP68...
  • Page 2: Tools Required

    Getting started Thank you for purchasing your Sunshine GardenHouse. We hope you will have many years of gardening success and enjoyment. Take time to review the printed instructions as well as the video. Preparing to build. A level well-drained area is essential to the assembly of your GardenHouse.
  • Page 3 Adding screws to the Redwood parts. Take care not to use extreme torque when adding screws to the Redwood. A soft wood, Redwood does not require extreme force to make the structure strong. PO Box 2068, Longview, WA 98632 Sunshine GardenHouse ™...
  • Page 4 You will notice tape covering some holes on the brackets. DO NOT add screws through the taped holes. ToP TRIAnGle Place and add 1-1/4”screws to secure brackets. Use deck screws through pre-drilled holes on each corner. 888-590-8657 Sunshine GardenHouse ™...
  • Page 5 Install the 2-sidewall top plates joining the front wall and back wall. RooF RIdGe Using a stepladder slip the roof ridge into the connectors on the top of the front and back wall. Use 5/8” screws. PO Box 2068, Longview, WA 98632 Sunshine GardenHouse ™...
  • Page 6 Starting in the back wall corner, place the first sidewall. Using the quick grip tool, tighten the sidewall to the back wall. On the inside of the greenhouse through pre-drilled holes, add deck screws. Continue adding sidewalls. Add 1-1/4”screws to the brackets on the outside of the side walls. 888-590-8657 Sunshine GardenHouse ™...
  • Page 7 Use the quick grip clamp to pull the roof panels together tightly. Place the 8 ft. roof apex in the V channel on the roof. Next place the 2 roof flashing on the peak and add 1-1/4”screws to secure. PO Box 2068, Longview, WA 98632 Sunshine GardenHouse ™...
  • Page 8 ¾” screws. Place the vent over the opening placing the hinges on either side. (Place so that a strong wind will not lift the vent by placing the hinges facing the windy side). 888-590-8657 Sunshine GardenHouse ™...
  • Page 9 Again using the quick clamp, pull the panels tightly together and secure with deck screws through the pre-drilled holes. collAR TIe The collar tie is installed on the inside of the greenhouse by screwing deck screws through the pre-drilled holes. PO Box 2068, Longview, WA 98632 Sunshine GardenHouse ™...
  • Page 10 Install each in the center of the vent. Use 1-1/4”screws to attach them to the frame. Be sure the vent opens and closes easily before installing the black cylinder. 888-590-8657 Sunshine GardenHouse ™...
  • Page 11: Door Hardware

    Place the 8 ft. long 2X4 into the bracket and use a hammer to push them into place. Space out the bench slats evenly. Add 1-1/4”screw to secure them to the 2x4 frame. PO Box 2068, Longview, WA 98632 Sunshine GardenHouse ™...
  • Page 12 You’ve completed your Sunshine GardenHouse. We are very interested to hear about your GardenHouse experience. Please send us your owner’s registration form so that we can keep you updated on any special information. e-mail or Fax Your comments: ...