In case of any questions not covered by this manual, please contact GreenFlux via INTRODUCTION info@greenflux.com. This manual describes how to install the Smart Charging Controller in a safe and correct way. By following the instructions in this manual, the controller can be installed correctly in the charging station.
More Depending on the telecom operator, the area the charging information on how to do this can be found in the GreenFlux Smart Charging station is installed and the frequency bands that are used, the Controller Configuration Manual.
These values should match controller configuration settings (please refer to the GreenFlux Smart Charging Controller Configuration Manual). Please refer to section 8 (Connection diagram) for connecting the relays in the correct way.
Figure 10 A RFID card reader readers are connected, they need to be configured correctly for the controller. Please refer to the GreenFlux Smart Charging Controller Configuration Manual how to do this. The detailed pinning of the RFId reader connector is defined as follows (for both...
Both, two-stage and three-stage servo lock actuators are S0- or RS485N Measuring of charging (PH)EV supported. Please refer to the GreenFlux Smart Charging Servo pin 1 (must remain controller Configuration Manual. With the configuration item Servo control unconnected when outlet is a “3StageServo”...
Both, two-stage and three-stage servo lock actuators are properly. Please refer to the controller configuration manual. supported. Please refer to the GreenFlux Smart Charging controller Configuration Manual. With the configuration item The reason pulse meters are not recommended is that for “3StageServo”...
XM50A is set up in the software. configuration parameter ‘MeterType’. The correct value can be found in the table 1000VM below. For information on how to change configurations please use the GreenFlux RS485 Tele S9 Connect via Modbus. Meter Smart Charging Controller Configuration Manual.
Page 18
The reason pulse meters are not recommended is that for optimal functioning of 9600 EVEN the GreenFlux Smart Charging controller, the charging current of the vehicle Metering should be known. When a pulse meter is used, the controller calculates the current Omnimeter Pulse UL v.4...
After receiving a “getConfiguration” command, the active local management password can be found in the charging station management portal Please refer to the GreenFlux Smart Charging Controller Configuration Manual on how to obtain the active password of the controller. 5.3.4...
Need help?
Do you have a question about the T2235-02 and is the answer not in the manual?
Questions and answers