Smead 64855 Assembly Instructions

Hanging folder frames

Advertisement

Assembly Instructions for Hanging Folder Frames 64855

Package contains components for two complete frames
A. Tie Rods (4)
B. Metal Side Rails (4)
C. U Frames (4)
D. Black Plastic Corner Pieces (8) (4 D1 / 4 D2)
E. Black Plastic Side Inserts (8)
Tools needed: tape measure, hammer and pliers.
Tools needed: tape measure, hammer and pliers
1. Measure the inside of the file drawer from front to back. This will determine the
length of the Metal Side Rails.
2. Measure two Metal Side Rails (B).
3. Measure the inside of the file drawer from front to back. This will determine the
length of the Metal Side Rails.
4. If necessary, place pliers next to indentation closest to the length you need, bend
back and forth until rail breaks. Use file to soften edges, if needed.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 64855 and is the answer not in the manual?

Questions and answers

Summary of Contents for Smead 64855

  • Page 1 Assembly Instructions for Hanging Folder Frames 64855 Package contains components for two complete frames A. Tie Rods (4) B. Metal Side Rails (4) C. U Frames (4) D. Black Plastic Corner Pieces (8) (4 D1 / 4 D2) E. Black Plastic Side Inserts (8) Tools needed: tape measure, hammer and pliers.
  • Page 2 Pieces DI & D2. 11. Slide Black Plastic Slide Inserts (E) in or out of Corner Pieces (D) to adjust for letter, legal or A4 hanging folders. For valuable organization tips and information, visit www.smead.com The Smead Manufacturing Company Hastings, Minnesota...

Table of Contents