Advertisement

Quick Links

C-Flow® LAB 1x1
Instruction Manual
21/08/2019
1

Advertisement

Table of Contents
loading

Summary of Contents for C-Flow LAB 1x1

  • Page 1 C-Flow® LAB 1x1 Instruction Manual 21/08/2019...
  • Page 2: Table Of Contents

    Introduction ........................3 Safety ..........................4 Unpacking ........................4 Specifications ........................5 Assembly Instructions ..................... 6 Parts List and Exploded View ................... 7 Troubleshooting ......................9 Cleaning .......................... 9 Templates ........................9 Other C-Flow Products ....................10 Disclaimer ........................11 21/08/2019...
  • Page 3: Introduction

    Templates are provided so that you can cut your own gaskets and membranes. C-Flow® LAB 1x1 has been designed based on our long experience of electrochemical R&D. We are constantly improving our products and we welcome any feedback or suggestions you have about C-Flow®...
  • Page 4: Safety

    Safety shoes should be worn when unpacking, assembling, disassembling or moving the cell. The user should carry out a risk assessment before using the C-Flow® LAB 1x1. This should include a COSHH assessment for the substances under test. Suitable Personal Protective Equipment should be worn and other suitable measures taken to control the risk of exposure to substances hazardous to health.
  • Page 5: Specifications

    Specifications Height 110 mm Width 100 mm with fittings Depth 150 mm with fittings Weight 1.25 kg End plates 304 stainless steel Electrode gap 10 mm Electrode dimensions 20 mm x 20 mm for working electrode area of 10 mm x 10 mm Electrode material carbon supplied as standard Current collectors...
  • Page 6: Assembly Instructions

    Assembly Instructions Place Stand with triangular base on a work surface with wide end towards user. Place Back Frame (plastic block, not the metal Back Plate) O-Ring groove side down onto inner notch on Stand. Carefully fit Electrode Gasket into recess of Back Frame and then fit Electrode, ensuring that the Electrode Gasket stays in place.
  • Page 7: Parts List And Exploded View

    Parts List and Exploded View Item Description Quantity Stand Terminal Knob Washer Insulating Disc Insulating Sleeve Electrode Pressure Knob Back Plate Current Collector Electrode Electrode Gasket Reference Electrode Port Plug Electrode Port 1/8” Electrode Port 1/16” Back Frame O Ring ID 40.95 Dia 2.62 Membrane Gasket Membrane (not supplied) O Ring ID 50.47 Dia 2.62...
  • Page 8 21/08/2019...
  • Page 9: Troubleshooting

    Troubleshooting Leaks Check for leaks with water. If there are leaks then disassemble, check all components and reassemble. Take care to ensure that Electrode Gaskets and O-Rings are in place and that the frames are square when tightening the thumb nuts. ...
  • Page 10: Other C-Flow Products

    It is an ideal general purpose electrochemical cell for research and development purposes. C-Flow PLT is a modular pilot plant that offers very high flow rates and flexibility of operation. It is perfect for electrochemical process development in industry or academia.
  • Page 11: Disclaimer

    Disclaimer Care has been taken in the preparation of this manual to give instructions of relevance to normal use of the product. All advice, analysis, calculations, information, forecasts and recommendations are supplied for the assistance of the user and are not to be relied on as a substitution for the exercise of judgement by the user.
  • Page 12 C-Tech Innovation Ltd Capenhurst Technology Park Capenhurst Chester CH1 6EH Tel: +44 (0) 151 347 2900 info@ctechinnovation.com www.ctechinnovation.com 21/08/2019...

Table of Contents