Safety: Site safety is a high priority when using all Jeneer equipment. Please use proper precautions when using our equipment and
wear proper safety gear.
Receiving Inspection: The Jeneer shipping box contains the Auto Bump Nema IV module and solar panel and installation kit if
ordered. If the shipping box is compromised please be sure to note when receiving.
The Auto Bump NEMV IV Module:
Regulator – pull up to adjust pressure
- Instruction Manual
Air In
Rev 7-20
Led On – Push to advance LED screens
Pump on – Push for a manual Auto Bump
DB-9 serial port
On/Off switch

Advertisement

loading

Summary of Contents for Jeneer Auto Bump

  • Page 1 - Instruction Manual Rev 7-20 Safety: Site safety is a high priority when using all Jeneer equipment. Please use proper precautions when using our equipment and wear proper safety gear. Receiving Inspection: The Jeneer shipping box contains the Auto Bump Nema IV module and solar panel and installation kit if ordered.
  • Page 2: Operation

    For instance if the “maxidle” is set for 2 hours if the pump has not recorded a cycle count and Auto Bump will occur The #4 screen is a trouble shooting tool. If you see 0 cycles after the...
  • Page 3 The Jeneer APP will allow you to change the “maxidle” setting. The “maxidle” is the amount of time that if the pump does not cycle a Auto Bump will occur. Tap on “maxidle” and enter the amount of time you want to allow the pump to sit idle and this will change the time.
  • Page 4 Pre-Assembly Installation Kit Installation Kit: Includes 32” 1 ¼” pole, 2 ea 1 ¼” strut clamps, 2 ea Quick Release hose clamp , 2 ea strut channel and 3 ea 1 ½” U-bolt clamps – note these may already be attached to the module and solar panel. . Quick Release Hose clamp Strut channel...
  • Page 5 Pre Assembly Installation Kit Solar Panel: Slide solar panel on pole and loosely tighten. You may want to adjust this One the module is attached to the well. The solar panel can be installed above or below the module. The solar panel should face South and West. Strut channel –...