Cheonsei KEMPION PDS Series Instruction Manual

Cheonsei KEMPION PDS Series Instruction Manual

Pulseless diaphragm metering pumps

Advertisement

Quick Links

METERING PUMPS
PDS Series
Pulseless Diaphragm Pumps
Instruction Manual
www.cheonsei.co.kr

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the KEMPION PDS Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Cheonsei KEMPION PDS Series

  • Page 1 METERING PUMPS PDS Series Pulseless Diaphragm Pumps Instruction Manual www.cheonsei.co.kr...
  • Page 3: Table Of Contents

    Introduction Thank you very much for purchasing Cheonsei PDS pumps. Before beginning operation, please read this instruction manual carefully. Correct handling, repair, & maintenance are described easily. Please use this pumps safely to be guaranteed performance & long life of the pump after reading this instruction manual.
  • Page 4: Notice For Safety

    Notice for Safety 1-1 Introduction • To use the products safely, the signs are showed on the manual like below. • As it is a matter of safety, please be sure to keep the directions in manual. • Each symbol and its meaning are described as below. Regarding the BLDC M/C UNIT supplied by us, always follow all directions (i.e., warning, caution etc.) described in the instruction manual specially provided as well as warnings and cautions in this manual.
  • Page 5: Confirmation Of Product

    2-1 Check Point When Unpacking Please check following points immediately after receiving the pump. If the defect is found from pump, please request it to local agent or Cheonsei.  Is specification correct as ordered?  Is there any missing parts?
  • Page 6: Model Code

    Model Code F W S ➊ ➋ ➌-a ➌-b ➍ ➎ ➏ ➐ ➑ ➊ MODEL PDS (PULSELESS DIAPHRAGM METERING PUMP) ➋ DIS. CAPACITY 5 : 5.5 L/min 10 : 10.5 L/min ➌ LIQUID END MATERIAL a. Head(P : PVC, F : PVDF, S : STS316, X : Special) b.
  • Page 7: Specification

    Specification PDS - 5 PDS - 10 Max. Discharge L/min (L/h) 5.5 (330) 10.5 (630) Capacity Max. Discharge bar(PSI) 5 (72.5) Pressure Pulse Rate(F/S) ± 3.0 Stroke Length Max. Stroke Number FLANGE KS 10K 25A / KS 10K 25A KS 10K 25A / KS 10K 40A Connection (Discharge / Suction)
  • Page 8: Performance Curves

    Performance Curves • Condition: Clean Water, Room Temperature, Suction Head - (1M) BLDC TYPE ●PDS-5 6000 ●PDS-10 12000 10800 5400 1 bar 4800 9600 1 bar 4200 8400 3600 7200 3000 6000 2400 4800 5 bar 5 bar 1800 3600 1200 2400 1200...
  • Page 9: Installation

    ● Discharge waveforms of the pulseless metering pump One rotation Discharge Rate The rate of discharge is kept uniform by overlapping the A and B section one anther. Installation 9-1 Installation Place Caution • D o not install this pump at the place where ambient temperature is higher than 40℃ or lower than freezing point.
  • Page 10  B e c a r e f u l t h a t p u m p i s n o t t o b e influenced with thermal stress of piping Pressure when transferring hot liquid or cold liquid. Gauge  Don’t make U shaped bend in the piping when transferring easily precipitable slurry.
  • Page 11 Caution • A fter checking the power specification of the BLDC M/C UNIT before wiring, connect the pump to the rated power. If not, it may cause trouble and fire. • Pump should be properly grounded in order to prevent electric shock. •...
  • Page 12: Operation

    Operation 10-1 Preparation Caution • Some water may be remained in the liquid end part of pump after final performance test. In case of use for some liquids reacting radically to water, remove water in the pump and dry the pump necessarily. When operating pump for the first time after installation, please check the following conditions.
  • Page 13: Maintenance

     It is concern that pump is damaged by freezing during winter season. Without regard to stop perioed of operation, drain the liquids in the piping and pump by operating dry run after opening the drain valve on the suction piping.  In case of stop pump operation for a long period(more than 1 week), the pump should be run at atmospheric pressure of discharge side for several minutes before going into normal operation.
  • Page 14 11-2 Inspection during operation (Daily inspection)  Check the level of liquid tank and, if it is insufficient, supplement the liquid. Specially, be careful in the process which handle the chemical solution or required Air-Free circumstance.  Check if liquid or air is leaked out the Joint or other parts. If necessary, fasten it again. If leakage doesn’t stop, check O-ring and/or Packing of each parts and replace the damaged O-ring and/or Packing with new one.
  • Page 15: Cause Of Trouble And Troubleshooting

    Cause & Action of Problem Problem Cause Action The circuit breaker opens or the fuse is burnt Look into the cause and take action Cables are broken Connect or replace Wrong wiring Check the wiring diagram Pump does Low voltage Investigate and take action not work Poor insulation...
  • Page 16: Replacement Of Parts

    Replacement of Parts Warning • W ear the protective equipment because any liquid which remains inside the pump may come out during disassembly and cause fatal injury to human body. ※ Refer to  18. Structure and Name of Check Valve  for assembly and disassembly. 13-1 Replacement of Ball Stopper, Cap Nut Ball Guide, and Check Ball...
  • Page 17 ⑤ U nscrew the head fixing bolt using a spanner to separate each part such as front flange, sub-ring, and head. Diaphragm(front) Backup Sub Ring Diaphragm Diaphragm Front flange Bolt Head ⑥ Unfasten the diaphragm rod with a spanner and then disassemble the front diaphragm. ⑦ R otate the motor slowly and hold the outer part of the diaphragm when the stroke length of the back diaphragm reaches 100%.
  • Page 18: Consumable Parts And Spare Parts

    • If the pump has been used for harmful & fatal liquid to health, please consult with before sending it.  Contact to Cheonsei or local distributor as shown on back of the manual if you have any problem or questions.
  • Page 19: Accessories

    Accesories  Back Pressure Valve According to the conditions of the piping, the discharge rate may be excessive or the pumping liquid may be continuously leaked in spite of stopping the pump which is caused by overfeed or siphon phenomena. The back pressure valve is for preventing such things.  Safety Valve(Relief Valve) When the discharge pressure increases to more than a setting point due to choking the valve with debris or closing the valve, the safety valve will open automatically to relieve the pressure.
  • Page 20 CSME - I - 01 2019. 10. 21. 40, ANSANTECOM-GIL, SANGNOK-GU, ANSAN-SI, GYEONGGI-DO, KOREA Phone : +82-31-508-1003 : +82-31-419-3223 E-mail : cheonsei@cheonsei.co.kr Homepage : http://www.cheonsei.co.kr...

This manual is also suitable for:

Kempion pds-5Kempion pds-10

Table of Contents