Download Print this page

Advertisement

Quick Links

Evco Controller Operating Manual
Thank you for your purchase.
This manual contains: set-up instructions, unit specs, safety information,
controller operation and maintenance steps.
K212, K225, K249, K272
IMPORTANT:
Your Unit is Preprogrammed
Place your unit in the desired location. Plug the unit in and allow it to cool and become
stable for a minimum of 24 hours before logging temperature or stocking products.
Be Careful When Setting or Changing Temperatures
WARNING: Changing some controller parameters can result in potentially damaging
your unit and/or losing your products. K2 will not be held responsible for losses due to
improper controller programming.
Unfamiliar with the operation of a K2 controller?
Use the video tutorials on our website resources page or call us for assistancee with
special parameters.
Some K2 units can be changed from Celsius to Fahrenhiet. We do not recommend
changing your unit to Farhenheit. Your controller has operational parameters that rely
on data in Celsius to maintain proper function.

Advertisement

loading
Need help?

Need help?

Do you have a question about the K212 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

K225K249K272