  • Page 1                             Bevi v1.0 Installation Guide  Last Revision: January 2019           ...
  • Page 2: Safety Notice

    ● Product package is single use and must be discarded and product not  reused upon removal from the equipment.    © 2018 Bevi. All rights reserved. support@bevi.co   ...
  • Page 3 Initializing the Service Panel  Connecting to the Internet  Initial Stocking  Creating the Machine Page  Final Steps  Purging the Carbonator  Flushing the Filter  Testing Water  Enter Incubation  Bevi Support          © 2018 Bevi. All rights reserved. support@bevi.co   ...
  • Page 4 Introduction   This guide is intended to detail the installation procedures for the Bevi  Standup v1.0. For information on installing other Bevi models, as well as  additional technical documents mentioned here, please visit the Partner  Resource site at partners.bevi.co . ...
  • Page 5       Flow Compensator and Line Filter Outflow Line with Pressure Regulator     Pentek OR 3M Filter        Regulator  Drip Tray      © 2018 Bevi. All rights reserved. support@bevi.co   ...
  • Page 6 WiFi Antenna Bevi Door Keys (2)   IMPORTANT NOTE: Only use ⅜” polyethylene tubing on the Bevi.   Do not use ¼” or smaller ; it will cause flow problems and machine damage.     Additionally, the following components are not included with the unit by ...
  • Page 7: Before Installation

    Before Installation   Site Requirements   Before installing a Bevi unit, it is necessary to conduct a site inspection ensure  that the space, plumbing, and electrical requirements are meant.  Specifications for a standup Bevi include:  ● Plumbing  ○ Minimum inflow rate of 1.3 gal/min (5 L/min) at 50 psi (3.5 Bar) ...
  • Page 8 1. Unlock the door of Bevi and remove the metal brace. Put aside.   2. Place the drip tray on the bottom of refill station and slide into place.   3. Plug the Bevi power adapter into back of Bevi, then into power outlet  (do not turn on power switch yet). ...
  • Page 9 Bevi (above flavor shelf 1), plug in using the internal power outlet, and  mount the two antennae 6-8” apart on the back side of the Bevi near  the top of the machine.  ...
  • Page 10 Installing the Carbonator    1. Lock the wheels of the Bevi so they do not roll and lift the carbonator  into the unit, with the overflow tube facing towards the door. This step  may be done before filling the ice bank for an easier lift.   ...
  • Page 11 87 psi/6 bar. If not, use a flathead screwdriver to adjust the  dial.   6. Place the CO tank into the left hand side of the Bevi and set it squarely  on top of the metal plate with the regulator facing outwards.  7. Strap the CO tank in by buckling the nylon strap around the tank. ...
  • Page 12 8. Place the new box in the appropriate area, checking that the spout is  facing outwards and hangs down slightly so concentrate can freely flow    © 2018 Bevi. All rights reserved. support@bevi.co   ...
  • Page 13 When you enter the service panel, it is important to navigate to the  Advanced tab to copy down the Machine ID and Touchscreen ID (the  Machine ID can also be found on a sticker on the back of the Bevi). You will  need this when Creating the Machine Page .  ...
  • Page 14 Connecting to the Internet    To connect to a network:  1. Press the Change button on the top of the service panel.   2. Select the appropriate connection type from the three options.     © 2018 Bevi. All rights reserved. support@bevi.co   ...
  • Page 15 Prime button, or double tap it to let it auto pour. Tap it  again to stop the flow.     2  To initialize the CO , press Restock and select 5lb or 10lb (we recommend 10lb  tanks).     © 2018 Bevi. All rights reserved. support@bevi.co   ...
  • Page 16: Final Steps

    To create a new machine page, you will need a smartphone or  computer (recommended).  1. Navigate to well.bevi.co and log in with your registered Google account  (please contact Bevi Support if you do not have an account).   2. On the Inventory page, press the + New Unit button. ...
  • Page 17 ● Sufficient CO concentration  ● Consistent flow    If any of these seem off, consult the Bevi Hardware Guide or contact Bevi  Support at support@bevi.co .    Enter Incubation  IMPORTANT NOTE: Incubation is a mandatory part of the installation  process. Without it, the Bevi temperature will be too high to properly ...