Advertisement

with internal glass-flake coating
Project:    
 
Doc:  
 
 
Date:  
                                                      2 4-­‐10-­‐2014  
Author:    
Checked:    
Email:
User Manual
HeatMatrix® LUVO
 
HeatMatrix   L UVO    
 
HMG-­‐109-­‐2013   r evision   2  
P.Tynkkynen  
R.   d e   G raaf  
HeatMatrix Group bv
Address: Directiekade 15, 3089JA, Rotterdam
info@heatmatrixgroup.com
Tel: + 31 10 8485317 KvK nr: 1723 5788
1 / 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LUVO and is the answer not in the manual?

Questions and answers

Summary of Contents for HeatMatrix LUVO

  • Page 1 User Manual HeatMatrix® LUVO with internal glass-flake coating Project:         HeatMatrix   L UVO     Doc:         HMG-­‐109-­‐2013   r evision   2   Date:                                                         2 4-­‐10-­‐2014  ...
  • Page 2 The equipment should only be used in areas that are not classified according • to ATEX 95 / 137. HeatMatrix Group bv Adress: De Ooyen 15, 4191PB, Geldermalsen Email: info@heatmatrixgroup.com Tel: + 31 10 8485317 KvK nr: 1723 5788...
  • Page 3 After 1 year of operation, the inside of the heat exchanger needs to be • inspected in the presence of a HeatMatrix employee. The heat exchanger can be inspected in the regular maintenance interval when there is no degradation of the heat exchanger observed during this first inspection.

Table of Contents