Download Print this page

Hovr Bracket System Quick Installation Manual

Advertisement

Quick Links

QUICK INSTALLATION GUIDE
Using the Hovr Bracket System
Cut male bracket to size needed. Male bracket should be 1" shorter than female bracket. Determine where the
studs are, mark them on male bracket. Take the 3/16" drill bit (included) and drill holes on top and bottom of
male bracket along die line.
Install female bracket to shelf using the 1" #10 Pan Head screws (please refer to the suggested installation
guide). Once the female bracket is installed into the shelf, take the 17/64" drill bit and make holes where you
want the set screws to be. On a 24 inch shelf we recommend 2 set screws, 3 inches in from each side.
TOP
Next take the tapping bit and tap (making threads). Any shelf longer
than 24 inches we recommend 3 set screws, 50 inches 4 set screws and
so on.
Now attach the male bracket level to the wall using the 2 1/2" #10 pan
head screws (4x). Click the shelf (female bracket) onto the wall bracket
(male).
Insert the set screws and tighten using the provided alan key. If you do
not want to use set screws you may opt to glue the female bracket to
the male bracket. You can use the E6000 or any other 2 component
metal epoxy, dap or silicone. Each of these has different holding strength.
This is a permanent installation and is hard to undo.
BOTTOM
Please Remember:
One can compare it with a closed door. As long as you do not push the handle, the door will
not open. Using the set screw has the effect of locking the door. You can push as hard as you want, even push-
ing the door handle, it will not open. In this case of the shelf, pushing upwards is pushing the door handle.
We provided some E-Z Load drywall anchors, just in case you do not find 2 studs.
However the maximum load capacity will now be diminished.
If you install the male bracket only in drywall we recommend using an anchor every 3-4 inches.
If you need to install the male bracket to the wall encountering galvanized steel studs, please only use "1shot"
steel anchor (available on our website) in connection with the E-Z Load drywall anchors.
FURTHER QUESTIONS?
Consult our 'Suggested Installation Guide' or Contact Us (options on reverse page)

Advertisement

loading
Need help?

Need help?

Do you have a question about the Bracket System and is the answer not in the manual?

Questions and answers

Summary of Contents for Hovr Bracket System

  • Page 1 QUICK INSTALLATION GUIDE Using the Hovr Bracket System Cut male bracket to size needed. Male bracket should be 1" shorter than female bracket. Determine where the studs are, mark them on male bracket. Take the 3/16" drill bit (included) and drill holes on top and bottom of male bracket along die line.
  • Page 2 These are included for you to get started and to know exactly what screws we recommend. You can buy this hardware through our website or at any hardware store. Thank you, Hovr Strong Solutions inc. CONTACT INFO #115 – 30600 Progressive Way, Abbotsford, BC, V2T 6Z2 ...