Instructions and standards for use of mobile scaffolding POKER POKER-HD Compulsory warnings for assembly, use, movements and dismantling of the mobile scaffold This manual must always accompany the mobile scaffold if it must be shown to competent authorities. EDITION March 2019...
Ensure all components of the mobile scaffold are present, comparing the table below. If parts are missing, replacement is forbidden with foreign parts not manufactured by FRIGERIO. (N.B: all components of the mobile scaffold are branded FRIGERIO and MADE IN ITALY)
Page 3
X. Brake the castors. The Poker is a professional mobile scaffold and allows use in indoor premises and in outdoor environments. The verticality with spirit level, or plumb line, must not be over 1°.
Page 4
Nobody should stand under suspended loads. Compulsory use of fall protection system, according to law. Work platforms The POKER work platform is composed of a platform with a trapdoor for passage. The work platform must be equipped with toe boards. These must be assembled by clicking into place;...
Page 5
Anchorage Systems Anchor to fixed parts The POKER mobile scaffold is subject to compulsory anchorage. Anchor the mobile scaffold every two metres even when assembled it is not in use. Anchor the mobile scaffold to the perimeter uprights and ensure a max.
Page 6
These characteristics meet the safety criteria dictated by European standard UNI EN 1004. Basically, the POKER-HD can be used UNANCHORED, if assembled with all its components according to the configurations indicated below.
PROTRAV guardrail braces if the resulting position necessary corresponds to a DAVANZ horizontal sill component Vertical upright POK SPALLA Note: in versions POKER-HD-04 and POKER-HD-03 +POK1/2CAM, no.1 intermediate work platform must be assembled with all the relevant side protection and toe boards. Stabilising POK BASESSCS...
Page 8
Instructions for movements Movements are only permitted on perfectly flat and smooth surfaces, and in the total absence of wind. To move the mobile scaffold, the brackets must be lifted, but not more than 12 millimetres. m 3.43 Movements can only take place longitudinally or diagonally to plan.
Use is not It is not permitted to rest permitted of and use lifting devices. bridge With the exception of the Frigerio pulley specifically for mobile connections scaffolds with a lifting capacity between mobile not exceeding 50 kg. This operation...
P.P.E. planned and fastening on the mobile scaffold The personal protective equipment planned for the mobile scaffolds are: - Fall protection harness with a coupling point, back and/or sternal, - Rope with double connector and fitted with energy absorber, - Positioning belt with rope and double clip, - Certified helmet, safety shoes and gloves.
Page 11
ITALIAN LEGISLATION Legislative Decree No. 81 on 9 April 2008 Art. 111 - Employer obligations for use of work equipment at a height 1. The employer, in the event temporary works at a height cannot be carried out in safe conditions and in adequate ergonomic conditions starting with a suitable location for the purpose, chooses the equipment most suitable for guaranteeing and maintaining safe working conditions, in compliance with the following criteria: a) priority given to collective safety measures over individual safety measures.
6) The bridges, excluding those used in works for contact electrical lines, must not be moved when workers or loads are on them. DECLARATION OF CONFORMITY It is hereby certified that the scaffold on a POKER base was constructed in compliance with Legislative Decree 81 on 9 April 2008. It is also declared that the same scaffold,...
Page 13
PERIODIC TESTING To compile once a year with a ballpoint pen, both in the event of test OK or test NOT OK, if necessary protecting from dirt by applying a strip of transparent adhesive tape. Test Part Test Test Name of test Description of fault Signature date...
Page 14
PERIODIC TESTING To compile once a year with a ballpoint pen, both in the event of test OK or test NOT OK, if necessary protecting from dirt by applying a strip of transparent adhesive tape. Test Part Test Test Name of test Signa Description of fault date...
Page 15
PERIODIC TESTING To compile once a year with a ballpoint pen, both in the event of test OK or test NOT OK, if necessary protecting from dirt by applying a strip of transparent adhesive tape. Test Part Test Test Name of test Description of fault Signature date...