Download Print this page

Advertisement

Quick Links

Gudrum Sarah
Assembly
Instructions

Advertisement

loading
Need help?

Need help?

Do you have a question about the FRL28-4530 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Simply Log Cabins FRL28-4530

  • Page 1 Gudrum Sarah Assembly Instructions...
  • Page 2: Inspection Certificate

    Controlecertificaat ● Kontrollschein ● Bulletin de contrôle ● Certificato di controllo ● Certificado de control ● Kontrollskjema ● Kontrol Certifikat Art. Nr. FRL28-4530 Please keep safely! Zorgvuldig te bewaren! ● Bitte gut aufbewahren! ● A bien conserver, s.v.p.! ● Da conservare! ● ¡A conservar! ● Ta vare på denne! ●...
  • Page 3 To be completed by buyer! (Please use block letters) ● In te vullen door de verkoper! (Graag in drukletters) ● Vom Käufer auszufüllen! (Bitte in Druckschrift) ● A remplir par l’acheteur! (en lettres d’imprimerie, s’il vous plaît) ● Da compilare dall’acquirente! (in stampatello) ● ¡Completa el cliente! (en mayúsculas) ●...
  • Page 4 Installation manual Montageanleitung ● Notice de montage ● Istruzioni per il montaggio ● Manual de montaje Log cabin FRL28-4530 Blockhaus ● Maisonnette en poutres ● Casa di travi ● Casa de jardin Width 450 x Depth 300 cm Breite/Tiefe ● Largeur/Profondeur ● Lunghezza/Profondita ● Ancho/Profundidad Log thickness 28 mm Bohlenstärke ●...
  • Page 5: General Information

    Installation manual 1 General information Dear client, We are glad that you have decided in favour of our garden house! Please read the assembly manual carefully before proceeding with the house installation! You will thus avoid problems and will not waste time. Recommendations: Keep the house package until its complete assembly in a dry place, but not in direct contact with the ground, protected from weather conditions (moisture, the sun, etc.).
  • Page 6: Preparation For Assembly

    Installation manual Garden house painting and maintenance Wood is a natural material, growing and adapting depending on weather conditions. Large and small cracks, colour tone differences and changes, as well as a changing structure of wood are not errors, but a result of wood growing and a peculiarity of wood as a natural material. Unprocessed wood (except for foundation joists) becomes greyish after having been left untouched for a while, and can be turn blue and become mouldy.
  • Page 7 Installation manual Preparation of components: Sort the components based on the wall plans (see Technical specifications) and place them at the four sides of the house in the installation sequence. ATTENTION: Never place the components directly on grass or a muddy surface because it will very difficult even...
  • Page 8 Installation manual Base frame (Foundation joists) The base frame of the house must be completely flat and level to ensure that the installation proceeds without problems. ATTENTION: different house can have different foundation placements – see the appended base frame drawing (in Technical specifications)! Place the impregnated foundation joists on the prepared foundation in accordance with the drawing at equal intervals.
  • Page 9 Installation manual Floor boards should be fixed to every foundation bearer with nails 2,5x50 mm. For nicer finish we suggest to nail the boards from top part of the tongue so the head of the nail will be covered with groove of next board.
  • Page 10: Door And Window

    nstallation manual Door and window Doorframe: Doorframe installation (Only necessary for a double door!):  If it is a double door, the doorframe supplied separate parts transportation requirements and will have to begin by assembling it.  To do this, place together the 4 parts of the frame and screw them onto one another.
  • Page 11 Installation manual Roof Before installing the roof, make sure that the house is completely level. Use the water-level to check all walls. ATTENTION: When placing the roof, use a stable ladder. Do not step on the roof as the structure is suitable to sustain only an even load (snow, wind, etc.), and not a point load! Fixate the roof triangle to roof rafter (pos.
  • Page 12: General Advice

    Installation manual Storm braces (NB! Not included in some house option kits!) Attach the storm braces (if included in the supplied kit) to the inner sides of the front (2 units) and back (2 units) Installation of storm braces: walls with the supplied bolts. It is important for the logs to be drilled through in advance.