Download Print this page

Furnika SB19 Assembly Instructions

Start based pullout furniture drawer

Advertisement

Quick Links

COMPONENT PARTS
1
Guide rails (left and right)
1 set
2
Back wall holder plate (left and right)
1 set
3
Side wall (left and right) with self-tapping screws
1 set
4
Front wall fastener with the self-tapping screws
2 pcs
5
Plug
2 pcs
MOUNTING DIMENSIONS for START
with SBDW12
Internal body dimension=LW
4 holes h12
Dimensions for back
Dimensions for mounting
wall fastening
of front wall fasteners on the
internal surface of front wall
DB8181
SBH61
SBDW12
SCHEME OF GUIDE RAILS ADDITION
NL – length of guide rails from the sidewall.
Minimal internal size of body in depth (NL+3 mm)
For sizes: 270 / 300 / 350 / 400
Front rim of body side wall
For sizes: 450 / 500 / 550
Instruction on assembly
of START based pullout
furniture drawer
SB19

Advertisement

loading
Need help?

Need help?

Do you have a question about the SB19 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Furnika SB19

  • Page 1 START based pullout furniture drawer Internal body dimension=LW SCHEME OF GUIDE RAILS ADDITION SB19 NL – length of guide rails from the sidewall. Minimal internal size of body in depth (NL+3 mm) For sizes: 270 / 300 / 350 / 400...
  • Page 2 DRAWER ASSEMBLY AND MOUNTING FRONT WALL ADJUSTMENT FRONT WALL DISASSEMBLY Attach the left and right holder plates (of back wall and pot rack) Attach the sidewalls to the drawer bottom with the help Horizontal adjustment of the front wall from Remove the plastic plugs to the drawer back wall with the help of self-tapping screws.