Page 1
Service Manual for the air- pressure test & repair of immersion suits Inspection Device for Immersion suits 70168 The aluminum kit contains a set of Servicing Equipment. Face fixture (two parts) Pressure gauge (0-6kPa) Foot pump (with multi-valve adaptor) Glue and applicator (two pieces) Instruction process 1.
Page 2
9. Install the Connector for the foot pump, by pressing 10. Adjust the multi-valve adaptor on the connector of face fixture. down the proper joint, so as to insert it properly. www.lalizas.com...
Page 3
2. Above is an example image of assembled face fixtures with hood. Apply a gentle amount of glue on the marked leaking areas. Let it dry for 8-10 minutes. Then apply once again, a glue layer on the immersion suit damaged area. Let it dry for 8 hours. www.lalizas.com...
Page 4
In case that the version of the Immersion Suit indicates a Service Table, mark the service date on it (Air Pressure Test). Otherwise, just mark on the indicated area of the suit, the Date of the Air-Test and the Type of Service (e.g. Service after X years). www.lalizas.com...