ABB TPL73-A30 Operation Manual page 23

Table of Contents

Advertisement

© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
Safety
Safe operation and maintenance
Safety during start-up / commissioning and operation
Before starting work, carry out visual inspection of working area.
Remove any obstacles and objects lying around.
Before start-up / commissioning, check all pipes from and to turbo-
charger for damage and leaks.
Don't work in any way that could impair safety when working on turbo-
charger.
After about every 12 hours of operation or at least once a day, inspect
turbocharger for visible damage and defects.
Immediately report any damage or changes in operational perfor-
mance to person responsible.
If damage is discovered, immediately shut down turbocharger and se-
cure it against inadvertent or unauthorized use.
When switching on auxiliary power sources (hydraulics, pneumatics,
electricity, water), keep an eye open for any hazards resulting from
supplying these power sources.
Safety during cleaning
It is possible that detergents or solvents will be used for cleaning. In this
case, the safety instructions of the Hazard due to operating materials and
supplies section in this chapter must always be observed.
Protect the floor against unintentional penetration of detergents or sol-
vents before starting cleaning operations.
Wear appropriate protective clothing.
Inspect the electric cables for abrasion and damaged areas before and
after your cleaning work.
2
2.6
Page 21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ht843415

Table of Contents