Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors These assembly instructions are valid for the dw 62-2 ME steel sliding door. Table of Contents Chapter Title Page General Information Types of Walls Assembly Preparation Maintenance/Inspections/Repairs Operation/Utilisation Warranty Outside Doors Arrangement of Wall Seals, Weight Boxes (optional) and Brackets Assembly Process...
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors General Information These installation instructions provide an overview of the current state of development. The utmost care has been taken to ensure that these instructions are error free. However, we shall not be liable for any possible printing errors or missing data.
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Ensure sure that nobody can be trapped or injured between objects or the wall and the opening and closing door. Ensure that no unauthorised people are in the opening and closing zone. Warranty Warranty with regard to function and safety can only be guaranteed if: Assembly is carried out correctly in accordance with the instructions,...
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Type of Fixing Distances Door Door Area “B“ “C“ “D“-“G“ “H“-“K“ “M“ Please refer to the enclosed See brackets dw 62-ME assembly/installation instructions for dimensions dimensions Important: Compare the door number in the assembly/installation instructions with the door number on the end panel to ensure correct assembly.
Page 6
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Caution: For brackets with two bore holes: Drill the first bore hole and fix and align. Subsequently drill the second bore hole Using FAZ 16/25 stay bolts Drill bit: Ø16mm Drilling depth: Min.130mm Brackets for masonry in the sliding area Insert bolt.
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Assembly of the angle and ceiling brackets Check height over the entire width (observe unevenness of the floor!) For wall mounting Measure the height for the angle brackets from the highest point of the floor (for rough concrete from the metre level).
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Fixing equipment for wall seals and counterweight For concrete: - Use Ø12mm expansion anchor; (Ø12mm drill bit, min. drilling depth 50mm) - Use M10 heavy duty anchor; (Ø10mm drill bit, min. drilling depth 80mm) For masonry: - Use Ø12mm synthetic plug;...
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors 7.5 Assembly of the Door Leaves Using leaf connector After pushing together the single leaves (1 + 2) (tongue and groove system) in package order, use the leaf connector (flat steel) to connect them, screw it tight using hexagon nuts (M 8) and plain washers (for elongated holes) or without washers...
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors For sliding doors with wicket door without sill Fix the guide shoe (1) in front of the run-in bracket (2), see above, and the guide shoe (6) behind the lateral wall seal (4). Two guide shoes (6 &...
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Wicket door without sill: Install and align the leaf together with the wicket door. Use the leaf connector to connect the upper leaves (see 5). Additionally screw the 3 M10x210mm countersunk screws (10) through the door frame into the adjacent leaf on the hinge side.
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Glazing Elements Various glass and glazing elements can be supplied. Glazing elements are fixed in rubber frames by the manufacturer. However, glazing elements can also be fixed in aluminium profiles by the customer. The manufacturer shall assume no liability for injuries or damage to persons or property caused by non shatter-proof glass or incorrect installation by third parties.
Page 13
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Assembly instructions for sliding doors with CarTeck 252 electric drive Important: The electric drive stated below (Marantec, type 252) should only be used for doors with a leaf area of ≤...
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Note: BMH hook bolt lock The door can be equipped with a hook bolt lock by the manufacturer. An information sticker should be affixed to both sides of the door leaf in the lock area to explain lock functioning and prevent damages. The information stickers are included in the accessories if the door has been equipped with this type of lock by the manufacturer.
Page 15
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors • Standard Version Fix the rope anchorage (1) to the last panel - viewed from the middle - using 2 M6x20mm bolts. The rope tension pulley (2) is fixed to the last runner rail sleeve using its hexagon bolts (sleeve distance from edge of door is min. 400mm).
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors For larger doors, bolt a magnetic clamp (7) to bracket (A) using M4x10mm bolts. Fix the magnetic clamp counterplate (7a) to the base plate on the rear door leaf using M4x8mm bolts. Weld or bolt the base plate to the door leaf seal in advance.
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Runner rail casing (optional) Type “A” • Fix the runner rail casing to the rail sleeve according to 2.8 (runner rail casing- “A” ceiling mounting. ype “B“ • Fix the runner rail casing to the ceiling [FAZ 12/10 plug (12);...
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors 12. General Safety Instructions for Assembly Always observe the maximum permissible loa ds when using lifting gear and devices. T he weight of the door is approx. 28kg/m². Only use intact and certified lifting devices (assembly cranes, fork lifts) and lifting gear (cables, chains, belts). Before lifting the ele ments ensure that the load is secured correctly and that it can neither become loose nor slip.
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Inspection Book for Power Operated Doors Teckentrup M ulti-Purpose Sliding Doors dw 40 –1/-2 and dw 62-1/-2, oor No.: ______________________________________________________________ ompany: ______________________________________________________________ ______________________________________________________________ ite: ______________________________________________________________ ______________________________________________________________ - 19 -...
Page 20
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Basic Principles for the Inspection of Power Operated Doors The safety technical requirements and test methods for the construction and equipment of power operated doors are specified in the European standard DIN EN 13241-1 : 2004, which puts the general requirements of the European Construction Products Directive in concrete terms.
Page 21
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors System Data Name: Teckentrup Multi Purpose Sli ding Doors Type: dw 40-1/-2, dw 62-1/-2 Door No.: _____________ Year of Construction: _____________ Commissioned on: ____________ Manufacturer (Installation Company) or Supplier: _______________________________________________...
Page 22
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Inspection List for Power Operated Sliding Doors ystem Data Name: Teckentrup St eel Multi Purpose Door Type.: dw 40-1/-2, dw 62-1/-2 Door No..:____________________ Year of Construction: __________________ Commissioning: __________________...
Page 23
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Main. n.a. Overload protection, e.g. slipping (function) clutches, pressure control valve 2.10 Slowing-down path (measurement) Control Controls (function) (push buttons, deadman control) Limit switch, emergency limit (function) switch Main switch (function) Devices for (function)
Page 24
Planning, Installation, Maintenance and Operating Instructions dw 62-2 ME Sliding Doors Main. n.a. arkings Sliding doo r, folding door (complete, legibility) manufacturer or supplier, year of construction, factor y no., licence no. CE marking (from 0 1.01.1997) Inspection findings and required measures (if necessary supplementary sheet): ___ _______________________________________________________________________ ______________________...
Need help?
Do you have a question about the dw 62-2ME and is the answer not in the manual?
Questions and answers