Advertisement

Quick Links

Side Panel
ASSEMBLY GUIDE
1.. The cubicle can be constructed either way up, for left or right hand opening.
2.. These instructions and list of parts assume that installation is done against solid or tiled walls. Hollow or
"Stud - partition" walls will require alternative fixings. Please consult a hardware supplier for the correct type.
It may also be necessary to consult your tiling supplier about the correct method for drilling your tiles.
3.. Please check this product for damage prior to starting the installation. No claims can be made after the
products have been fitted, or after fitting has commenced.
4.. This is a 2 person installation.
5.. Please note the minimum and maximum adjustment for this product are based on perfectly plumb walls.
Please note hand tools NOT supplied.
Spirit Level
7mm Masonry Drill
PH2 TYPE
Drill
3.2mm HSS Drill
Pencil
Tape Measure
Sealant Gun
Screwdriver

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the A8 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Orbit A8

  • Page 1 Side Panel ASSEMBLY GUIDE 1.. The cubicle can be constructed either way up, for left or right hand opening. 2.. These instructions and list of parts assume that installation is done against solid or tiled walls. Hollow or “Stud - partition” walls will require alternative fixings. Please consult a hardware supplier for the correct type. It may also be necessary to consult your tiling supplier about the correct method for drilling your tiles.
  • Page 2 Side Panel EXPOLDED VIEW AND PARTS LIST Code Description Image 1 N/M Side Glass Panel 2 ALU13660 Cover Profile 3 S1PS38-L/R Corner Post Cap L/R 4 S1PS05 Upright Profile Cap 5 S1PS20 Cover Profile Clip 6 SBLTL003 ST 3.5 x 12 Screw TRAY MUST BE SEALED FULLY AROUND WHERE THE TRAY MEETS THE WALL TRAY MUST BE 100% LEVEL IN ALL DIRECTIONS...
  • Page 3 Step A Position the assembled door frame with the side panel (with wall profile and corner post fully pushed into frame) onto the tray and decide on the step in from the edge of the tray to wall profiles. The wall profiles and corner post can be adjusted until the door is positioned correctly on the tray.
  • Page 4 Step C Drill 3 equally spaced holes with 3mm drill bit through the wall profiles and frame. Fix the frame to the wall profile with ST3.5 x 12 screws (8 x SBLTL003). Put the Cover Profiles (2 x ALU13660) on the plastic clip (8 x S1PS20). tep D Drill 3 equally spaced holes with 3mm drill bit through the corner profile and...
  • Page 5 Step E Put the upright profile caps S1PS05 and wall channel caps S1PS21L/R on. Step F Put the upright profile cap S1PS05 and corner post cap S1PS38L/R on. 24 HRS DO NOT USE THE ENCLOSURE FOR BLEACH WHITE 24 HOURS AFTER SPIRIT SEALING Step G...

Table of Contents