Remove The Turbocharger - ABB HT566891 Operation Manual

Table of Contents

Advertisement

7.3
7.3
© Copyright 2016 ABB. All rights reserved.
Removal and installation

Remove the turbocharger

Remove the turbocharger
Disconnect all exhaust gas and air lines according to the instructions
of the enginebuilder.
Version with water-cooled bearing casing:
Disconnect the water pipes according to the instructions of the en-
ginebuilder.
If present, remove hard insulation as follows:
Remove screws and sheet metal (B) from the bearing casing insula-
tion.
Remove the remaining screws from the bearing casing insulation (A).
Pull the bearing casing insulation up and off. The bearing casing insu-
lation can be compressed to facilitate the removal process.
Unplug the cable connector from the speed sensor.
Attach lifting gear to bearing casing.
If a gas outlet bend is present, sling lifting gear around it or secure it to
the lifting gear with a swivel lifting eye (C).
Loosen the fixing screws (D) on the bearing casing.
Lift the turbocharger from the engine and put it down.
Cover oil connections.
Operation Manual / TPS44-F.. - TPS61-F..
7
7.3
Page 87

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tps48-f32

Table of Contents