LG LM-1830H2L Svc Manual page 42

Multi air conditioner
Hide thumbs Also See for LM-1830H2L:
Table of Contents

Advertisement

(3) Gas Charging
(After Evacuation)
• Procedure
1. Connect the gauge to the charging cylinder.
- Connect the charge hose which you disconnect-
ed from the vacuum pump to the valve at the
bottom of the cylinder.
- If you are using a gas cylinder, also use a scale
and reverse the cylinder so that the system can
be charged with liquid.
2. Purge the air from the charge hose.
- Open the valve at the bottom of the cylinder and
press the check valve on the charge set to
purge the air. (Be careful of the liquid refriger-
ant). The procedure is the same if using a gas
cylinder.
3. Open the low handle on the gauge and charge
the system with liquid refrigerant.
- If the system can not be charged with the speci-
fied amount of refrigerant, it can be charged
with a little at a time (approximately 150g each
time) while operating the air conditioner in the
cooling cycle; however, one time is not suffi-
cient, wait approximately 1 minute and then
repeat the procedure(pumping down-pin).
Copyright ©2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Liquid side
Indoor unit
Gas side
Liquid side
Indoor unit
Gas side
manifold gauge
Charging
cylinder
Low-handle
(OPEN)
Hi- handle
Check valve
(OPEN)
Outdoor unit
Open
2-Way
valve
Open
3-Way
valve
Open
2-Way
valve
Open
3-Way
valve
This is different from previous procedures.
Because you are charging with liquid refrigerant
from the gas side, absolutely do not attempt to
charge with larger amounts of liquid refrigerant
while operating the air conditioner.
4. Immediately disconnect the charge hose from
the gas side valve's service port.
- Stopping partway will allow the gas to be dis-
charged.
- If the system has been charged with liquid
refrigerant while operating the air conditioner
turn off the air conditioner before disconnecting
the hose.
5. Mount the valve stem nuts and the service port
nut.
- Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.(4.2kg.m/5.5kg.m.)
- Be sure to check for gas leakage.
6. Apply steps from 1 to 5 to each unit (A-unit, B-
unit) by the same method.
- 42 -
LGE Internal Use Only

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents