Download Print this page

TIE DOWN 71089 Instruction Manual

Hatch rail system

Advertisement

Quick Links

Keep these instructions for
future reference.
Read and understand these instructions completely before installing the Tie Down Hatch Rail System. It is the installer's
responsibility to follow installation instructions to ensure design performance of the Tie Down Hatch Rail System.
The installer could be liable for claims that result from improper installation.
The Tie Down Hatch Rail System is designed to
protect open rooftop access hatchways and to
provide grab bars for assistance in ascending
and descending the hatchway.
Tools Required (Not Included) for Installation:
• Level
• Drill with 1/2" drill bit
• 5/16-inch Hex (Allen) Wrench
• 5/16-inch Hex Drive Socket (to fit torque wrench)
• Torque wrench 5 – 50 ft. lb. range
• Marker or Pencil
• Tape Measure
• Blue (removable) Tread Locking Compound
WARNING: This product can expose you to chemicals including Nickel, which is known to the
State of California to cause cancer. For more information go to: www.P65Warnings.ca.gov
WARNING: This product can expose you to chemicals including Nickel, which is known to the
State of California to cause cancer. For more information go to: www.P65Warnings.ca.gov
WARNING: This product can expose you to
chemicals including Nickel, which is known to
the State of California to cause cancer. For more
information go to: www.P65Warnings.ca.gov
WARNING: This product can expose you
to chemicals including Nickel, which is
known to the State of California to
cause cancer. For more information
go to: www.P65Warnings.ca.gov
WARNING: This product can expose you
to chemicals including Nickel, which is
known to the State of California to
cause cancer. For more information
Hatch Rail System
Instruction Manual
48x48 Model
Online Manual
404-344-0000 • www.tiedown.com
605 Stonehill Drive SW, Atlanta, GA 30336
sales@tiedown.com
Instruction Sheet #08379
E1838, Rev. 10/12/21

Advertisement

loading
Need help?

Need help?

Do you have a question about the 71089 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for TIE DOWN 71089

  • Page 1 Keep these instructions for future reference. Read and understand these instructions completely before installing the Tie Down Hatch Rail System. It is the installer’s responsibility to follow installation instructions to ensure design performance of the Tie Down Hatch Rail System.
  • Page 2 Nylock Nut (3/8”) Carriage Bolt (3/8”x 3-1/2”) Cross Over Bracket Swing Gate Pin (3/8”x3-1/4”) Swing Gate Tension Spring Swing Gate Safety Pin 5/16” Hex Key (not shown) TIE DOWN Safety Products Division 800-241-1806 • 404-344-0000 • www.tiedown.com E1805 Rev. 10/12/21...
  • Page 3 Fig 3-3. Leave mounting bracket loose to enable pluming of the vertical post. Fig 3-3 TIE DOWN Safety Products Division 800-241-1806 • 404-344-0000 • www.tiedown.com E1805, Rev. 10/12/21...
  • Page 4 Secure with nylock nut. Torque nuts to 20 ft lbs. Fig 4-2. Using a level, plumb the hatch post while tightening the threaded nut clips. Fig. 4-2 Fig. 4-3 TIE DOWN Safety Products Division 800-241-1806 • 404-344-0000 • www.tiedown.com E1805 Rev. 10/12/21...
  • Page 5 Secure pin with the safety pin. See Fig. 5-3. Repeat for the second pin/spring mount. Flat Work Surface Swing Gate Hinge Tab Swing Gate Hinge Pin Fig. 5-3 Swing Gate Spring Swing Gate Safety Pin TIE DOWN Safety Products Division 800-241-1806 • 404-344-0000 • www.tiedown.com E1805, Rev. 10/12/21...
  • Page 6 Slide the gate outward so the gate stop is in contact Fig. 6-2 with the opposite vertical post. Replace the screws in the back of the swing gate. See Fig. 6-3 Fig. 6-3 Fig. 6-3 TIE DOWN Safety Products Division 800-241-1806 • 404-344-0000 • www.tiedown.com E1805 Rev. 10/12/21...
  • Page 7 Lightly tighten the 3/8” nut on the cross over bracket. Repeat the cross over bracket assembly for the remaining vertical posts. Do not tighten brackets. Fig 7-2 TIE DOWN Safety Products Division 800-241-1806 • 404-344-0000 • www.tiedown.com E1805, Rev. 10/12/21...
  • Page 8 • Check that the swing gate closes to vertical post Fig 8-3 Safety Products Division 605 Stonehill Drive SW, Atlanta, Georgia 30336 404-344-0000 • www.tiedown.com ISO 9001:2015 Certification Intellectual Property of TIE DOWN Inc. ©2020 TIE DOWN, Inc. Instruction #08379 (E1838 Rev. 10/12/21)