Do you have a question about the MAYCO ST-70 and is the answer not in the manual?
Questions and answers
Summary of Contents for Discount Equipment MAYCO ST-70
Page 1
PARTS AND OPERATION MANUAL MODEL ST-70 Structural Concrete Pump (Hatz Diesel Engine) Revision #4 (05/29/07) THIS MANUAL MUST ACCOMPANY THE EQUIPMENT AT ALL TIMES.
Page 2
Discount-Equipment.com is your online resource for quality parts & equipment. Florida: 561-964-4949 Outside Florida TOLL FREE: 877-690-3101 Need parts? Click on this link: http://www.discount-equipment.com/category/5443-parts/ choose one of the options to help get the right parts and equipment you are looking for.
Page 3
Diesel engine exhaust and some of PAGE 2 — ST-70 — PARTS & OPERATION MANUAL — REV. #4 (05/29/07)
TABLE OF CONTENTS Here's How To Get Help .......... 3 Service Information Table Of Contents ........... 4 Wiring Schematic: Parts Ordering Procedures ........5 1) Interior Control Panel (Inside Door) ....74 2) Schematic Electrical Control Box ....75-76 3) Interconnect Electrical Control Box ....77 Hydraulic Diagram ...........
MAYCO PUMP WARRANTY Mechanical Drive Models Hydraulic Drive Models MAYCO PUMP, hereinafter referred to as “Manufacturer’, MAYCO PUMP, hereinafter referred to as “Manufacturer”, warrants each new Mayco Pump sold by the manufacturer to warrants each new Mayco Pump sold by the manufacturer to be free from defects in material and workmanship, under be free from defects in material and workmanship, under normal use and service, for a period of one year after the date...
ST-70 — SAFETY INSTRUCTIONS READ THIS PARTS AND OPERATION MANUAL TRAVEL AND TRANSPORTATION THOROUGHLY BEFORE USING THIS MACHINE. It describes The machine must not be moved with extended outriggers. the safe, proper and most efficient way to operate it. KNOW Before traveling, check the transportation safety devices of YOUR MACHINE! the outriggers, the tire pressure and the functioning of the...
Page 8
ST-70 — SAFETY INSTRUCTIONS STABILIZER JACK PIPELINES PIPELINES AND CLAMPS MUST BE OF SUFFICIENT SIZE Prior to jacking check the soil conditions. If necessary, enlarge FOR THE PUMP’S CAPACITY. the support foot area by placing square timbers underneath. The pipeline connections must not be opened under working Keep a sufficient distance from excavations;...
Page 9
ST-70 — SAFETY INSTRUCTIONS O. Never fill the fuel tank while the engine is running or hot. MODEL ST-70 Avoid the possibility of spilled fuel which may cause a fire. P . Always carry a fire extinguisher of adequate size and a THE OPERATOR IS IN COMPLETE CHARGE OF THE PUMP first aid kit.
ST-70 — GENERAL INFORMATION The principle of concrete pumping is based on self-lubrication. CONCRETE MIX DESIGN As it moves through the transfer line, the concrete takes the shape of a plastic cylinder. It is forced through the transfer line Mix design is most important to achieve maximum pumpability. on a film of mortar that is self-troweled to the service of the Pumpability is affected by, among other factors, the type and transfer line around its full periphery by the slug of concrete...
Page 12
ST-70 — GENERAL INFORMATION REGIONAL DIFFERENCES In addition, the Mayco Structural Concrete ST-70 Pump can be used to pump a large aggregate hard rock as follows: 1. Pea rock (1/2" minus) pump with mixes being as low as Concrete is made by mixing locally available rock and sand 30% rock and 70% sand.
ST-70 — CONCRETE MIX INFORMATION Job Identification* _______________________________________ Date* ______________________________________ Architect* ______________________________________________ General Contractor* ___________________________ Structural Engineer* ______________________________________ Concrete by* ________________________________ THE PROPORTIONS SHOWN HERE ARE A RECOMMENDATION BASED ON TESTS OF SAMPLES RECEIVED BY THE LABORATORY. TESTS PERFORMED BY SUPPLIERS OR MANUFACTURERS OR ON PRIOR KNOWLEDGE OF THE MATERIALS INVOLVED AND IS LIMITED TO INFORMATION DERIVED FROM THESE SAMPLES TESTS BY OTHERS OR TO THAT PRIOR KNOWLEDGE.
Page 14
ST-70 — CONCRETE MIX INFORMATION Job Identification* _______________________________________ Date* ______________________________________ Architect* ______________________________________________ General Contractor* ___________________________ Structural Engineer* _____________________________________ Concrete by* ________________________________ THE PROPORTIONS SHOWN HERE ARE A RECOMMENDATION BASED ON TESTS OF SAMPLES RECEIVED BY THE LABORATORY. TESTS PERFORMED BY SUPPLIERS OR MANUFACTURERS OR ON PRIOR KNOWLEDGE OF THE MATERIALS INVOLVED AND IS LIMITED TO INFORMATION DERIVED FROM THESE SAMPLES TESTS BY OTHERS OR TO THAT PRIOR KNOWLEDGE.
Page 15
ST-70 — CONCRETE MIX INFORMATION Job Identification* _______________________________________ Date* ______________________________________ Architect* ______________________________________________ General Contractor* ___________________________ Structural Engineer* _____________________________________ Concrete by* ________________________________ THE PROPORTIONS SHOWN HERE ARE A RECOMMENDATION BASED ON TESTS OF SAMPLES RECEIVED BY THE LABORATORY. TESTS PERFORMED BY SUPPLIERS OR MANUFACTURERS OR ON PRIOR KNOWLEDGE OF THE MATERIALS INVOLVED AND IS LIMITED TO INFORMATION DERIVED FROM THESE SAMPLES TESTS BY OTHERS OR TO THAT PRIOR KNOWLEDGE.
Page 16
ST-70 — CONCRETE MIX INFORMATION — s u l The sand content of pumpable concrete is very important. It is one of the two major ingredients that change due to regional location (the other is the rock or gravel). Above is a typical sieve analysis of washed concrete sand (W.C.S.) to A.S.T.M.
SLUMP TEST PROCEDURE 1. To obtain a representative sample, take samples at three or more regular intervals throughout the discharge of the mixer or truck. DO NOT take samples at the beginning or end of the discharge. 2. Dampen the inside of the cone and place it on a smooth, moist, nonabsorbent, level surface large enough to accommodate both the slumped concrete and the slump cone.
ST-70 — OPERATION (How it Works) The following is a brief explanation of how the concrete cylinders, hydraulic cylinders, shuttle tube, valves and hopper work in sequence to pump HIGH PRESSURE TO TANK TO TANK OIL FROM PUMP concrete. PROXIMITY SWITCH The hydraulic pressure is generated by variable...
This section is intended to assist the operator with the initial Figure 1 illustrates the basic operating controls and indicators start-up of the MAYCO ST-70 Concrete Pump. It is extremely on the MAYCO ST-70 Concrete pump. Each of the items important that this section be read carefully before attempting referenced will be discussed.
Page 20
INITIAL START-UP PROCEDURE Engine Oil If the hydraulic oil level is low, remove the cap just above the oil level sight glass and add the correct amount of 1. Pull the engine oil dipstick from the engine side panel as hydraulic oil to bring the hydraulic oil level to a normal shown in Figure 2.
Page 21
INITIAL START-UP PROCEDURE D. Insert the cotter pin into handle tee bolt eye to lock the 7. Observe that the Air Filter and Oil Pressure status indicator stabilizer stand. lights are ON (Figure 9). The Battery status indicator light should be OFF Emergency Stop Switch A.
Page 22
INITIAL START-UP PROCEDURE 9. Turn the Volume Control (Figure 11), lock nut counterclockwise (CCW) to release the volume control knob. RPM X 100 VOLUME CONTROL TACH LOCK NUT HOURS Figure 13. VOLUME CONTROL Engine Tachometer INCREASE DECREASE TURN CLOCKWISE TO Figure 11.
Page 23
INITIAL START-UP PROCEDURE A. While monitoring the tachometer, (Figure 13) turn the Turn the Fan switch to the OFF position and listen for fan to engine Throttle Control (Figure 14) clockwise until the stop. If machine exceeds 170°F, and to cool the machine down, engine speed reaches 2550 RPM (maximum speed).
Page 24
Important Notice! During freezing temperature after pumping, completely drain the water box and cover the hopper. Frozen The MAYCO ST-70 Concrete Pump has a remote control feature liquid will restrict the piston travel and cause severe damage to that allows the pump to be remotely controlled. If desired, the the pump.
ST-70 — OPERATING PROCEDURES 14. Vertical and down-hill pumping are more difficult than Important Rules for the Setup and Operation of horizontal pumping. Vertical pumping requires higher Mayco Model ST-70 Hydraulic Concrete Pump pumping pressure. Down-hill pumping can cause separation of the concrete, which can cause a blockage. Back pressure must be kept in the line at all times during 1.
Page 26
ST-70 — OPERATING PROCEDURES Priming the Pump and Delivery System with Slurry. Waiting for concrete trucks to arrive: If there are delays: It is CRITICAL to the successful operation of a concrete 19.1 Stop the pump with a full hopper. pump that the manifold and all delivery hose, pipe and 19.2 Run the remixer, alternating forward and reverse, elbows are coated with a film of lubrication BEFORE...
Page 27
ST-70 — OPERATING PROCEDURES 7. The shuttle tube is plugged if volume at the discharge end 3. Damaged hoses with internal restrictions can cause blockages. of the hose stops, the hose is soft and the hydraulic oil pressure gauge reads 3000 psi or more. 4.
Page 28
ST-70 — OPERATING PROCEDURES Chip the blockage out with the pry-bar. 10. If the volume at end of hose starts to decrease gradually and eventually almost stops, it is quite likely that the wear Flush the shuttle tube with water. ring and/or wear plate have to be replaced due to Replace and seal the inspection cover plate on the shuttle excessive wear allowing the concrete to be discharged...
Page 29
ST-70 — OPERATING PROCEDURES 14. All new pumps are ‘water pressure tested” at the factory 7. Fill hopper with water. Pump until sponge and clean water This procedure permits a thorough inspection of entire come out the discharge end of the hose and line system. drive system and valving under simulated full load 8.
ST-70 — TOWING INFORMATION 1. Position actuator ball socket above 2" ball. 5. To make sure that the actuator is securely latched onto the ball, extend the trailer tongue jack to the ground and lift the WARNING: Use jack stand to lift tongue. Do NOT lift by truck and trailer combination 2"...
Page 31
ST-70 — TOWING INFORMATION 10. Retract the jack fully. Remove and store the caster, if BACKING UP applicable. 1. Refer to the previous steps 1 through 14 for Towing. 11. Check for proper truck-trailer hook-up; the tow vehicle and 2. Before backing up a slope or through soft ground, pull the trailer should be level with a positive tongue load.
Page 32
ST-70 — TOWING INFORMATION 5. If the pump is to be uncoupled from the tow vehicle after Extended Storage Instructions backing with the lever knob engaged, block all pump wheels The following preventative maintenance is recommended for and pull forward slightly to take strain off of the actuator. extended periods of storage.
EXPLANATION OF CODE IN REMARKS COLUMN The following section explains the different symbols and remarks QTY. Column used in the Parts section of this manual. Use the help numbers Numbers Used - Item quantity can be indicated by a number, found on the back page of the manual if there are any questions.
ST-70 — SUGGESTED SPARE PARTS ST-70 Structural Concrete Pump ST-70 Structural Concrete Pump 3 Units 1 Units Qty. Description Qty. Description 1 ..EM16459 ....PIN 1 ..EM16462 ....FELT HOLDER 2 ..EM25801 ....CONCRETE CYLINDER 4 ..EM16463 ....PISTON CUP 2 ..
Page 35
ST-70 — DECALS The safety instruction decals shown must be on all Mayco ST70 — Concrete Pump A MANUAL MUST BE STORED IN THIS TUBE AT ALL TIMES. ATTENTION CAUTION BEFORE SET-UP AND OPERATION OF THIS EQUIPMENT THE DESIGNATED OPERATOR MUST READ AND COMPLETELY UNDERSTAND THE OPERATING AND INSTRUCTION MANUAL INSIDE THIS TUBE.
ST-70 — CONTROL PANEL FRONT PAGE 40 — ST-70 — PARTS & OPERATION MANUAL — REV. #4 (05/29/07)
Page 40
ST-70 — CONTROL PANEL FRONT ST- 70 CONTROL PANEL FRONT PART NO. PART NAME QTY. REMARKS EM97073 CONTROL PANEL ASSY 1 .... (INCLS. SWITCHES AND INTERIOR ITEMS AS SHOWN ON PAGES 32 & 33). EM25704 TACHOMETER EM97063 SWITCH, EMERGENCY STOP EM97064 NAME PLATE, EMERGENCY STOP EM97062...
ST-70 — MAIN DRIVE PUMPS PAGE 46 — ST-70 — PARTS & OPERATION MANUAL — REV. #4 (05/29/07)
Page 46
ST-70 — MAIN DRIVE PUMPS ST-45 MAIN DRIVE PUMPS PART NO. PART NAME QTY. REMARKS EM 97088 COUPLING ASSY, ENGINE EM 506611 SOCKET HD. M12 x 20 EM 25459 ELBOW 90 DEG. EM 509777 HOSE, CASE DRAIN LINE EM 509784 ELBOW 90 DEG.
ST-70 — MANIFOLD CONTROL PAGE 48 — ST-70 — PARTS & OPERATION MANUAL — REV. #4 (05/29/07)
Page 48
ST-70 — MANIFOLD CONTROL ST-70 MANIFOLD CONTROL PART NO. PART NAME QTY. REMARKS EM97011 DIRECTIONAL CONTROL VALVE, HYDRAULIC CYLINDER EM97013 DIRECTIONAL CONTROL VALVE, SHUTTLE CYLINDER EM97002 PILOT VALVE EM509342 SOCKET HEAD, 3/8"-NC x 2-1/2" EM196 SOCKET HEAD, 1/4"-NC x 2-1/4" EM508804 SOCKET HEAD, 10-NC x 2"...
Page 50
ST-70 — ACCUMULATOR ST-70 ACCUMULATOR PART NO. PART NAME QTY. REMARKS EM97015 ACCUMULATOR EM97016 CLAMP EM509425 ADAPTER EM509353 ELBOW 90 DEG. EM509562 BOLT, HEX. HD 3/8"-NC x 5/8" EM492624 WASHER, LOCK 3/8"-NC EM492598 WASHER, 3/8" EM509444 BRACKET EM492373 BOLT, HEX. HD 3/8"-NC x 3/4" EM98099 ACCUMULATOR REPAIR KIT NOT ILLUSTRATED...
Page 51
Discount-Equipment.com is your online resource for quality parts & equipment. Florida: 561-964-4949 Outside Florida TOLL FREE: 877-690-3101 Need parts? Click on this link: http://www.discount-equipment.com/category/5443-parts/ choose one of the options to help get the right parts and equipment you are looking for.
ST-70 — ENGINE AND FRAME PAGE 62 — ST-70 — PARTS & OPERATION MANUAL — REV. #4 (05/29/07)
Page 63
ST-70 — ENGINE AND FRAME ST-70 ENGINE AND FRAME PART NO. PART NAME QTY. REMARKS EM25454 CYLINDER, SHUTTLE EM25459 ELBOW, 3/4" x 90° EM25500 ELBOW, 3/4" x 45° EM132 BOLT, HEX HD, 1/2-13 x 2" EM621 WILLIAM WASHER, 1/2" EM606 WASHER, LOCK, 1/2"...
ST-70 — OPTIONAL RADIO CONTROL PAGE 80 — ST-70 — PARTS & OPERATION MANUAL — REV. #4 (05/29/07)
Page 81
ST-70 — SERVICE INFORMATION The service procedures contained in this manual are intended for use by an individual equipped with the proper tools and equipment and familiar with safe shop practices. Should questions arise during the service or repair . . . stop . . . and contact Mayco service department.
ST-70 — SERVICE INFORMATION Maintenance check schedule l i o r i a l i f r e t l i f r e t c i l l l i c i r i t a c i l l i o c i l e t l...
Page 83
ST-70 — SERVICE INFORMATION Lubrication: Grease daily/Hour ■ Main hydraulic cylinders - 2 Place ■ Remix bearings - 2 Place ■ Axle crank - 1 Place ■ Suttle cylinders - 2 Place ■ “S” tube outlet flange - 3 Place Grease Type: Lithium Based EP Texaco Multitak 20...
ST-70 — SERVICE INFORMATION ST70 Pressure Setting Sequence (Setting maximum pump pressure) Step 1: Remove acorn nut from pressure compensator (located on the top front of the Rexroth pump. The compensator is the lower of the two valves) loosen the jam nut and turn the allen screw clockwise until it seats.
ST-70 — SERVICE INFORMATION ST-70 Accumulator Circuit Checking accumulator bladder pressure The accumulator charge pressure should read 1100 PSI. To The accumulator circuit has two functions in the hydraulic check pressure, start engine and stroke the pump. The system. accumulator pressure gauge should read 1750 PSI. To determine the actual accumulator PSI, stop engine and observe The accumulator circuit furnishes the hydraulic pressure the pressure gauge.
ST-70 — SERVICE INFORMATION Hydraulic system trouble shooting Problem Accumulator pressure drops to zero on every cycle Problem i t u r t i r o t h t i r t i No hydraulic oil flow from axial piston pump. .
ST-70 — SERVICE INFORMATION Electrical System Electrical Problem Proximity switches When starter switch is activated and nothing occurs. The proximity is a normally open switch. The proximity develops i t u a radio frequency, which is emitted from the face of the proximity y t l o r t , l e...
ST-70 — SERVICE INFORMATION Changing the concrete cylinder piston cups Step 5: Start engine and turn on pressure test switch, cycle pump in reverse until hydraulic system obtains maximum pressure, at this point turn pump and engine The Rubber piston cups will occasionally require replacement off.
ST-70 — SERVICE INFORMATION Changing the wear plate and ring Step 6: Clean out all concrete build up in and around the nun- plate area with a wire brush. Due to the swinging motion of the Nun-plate and the abrasive nature of concrete it is normal for the cutting ring to wear on the Step 7: Inspect the wear components for indications of wear.
ST-70 — SERVICE INFORMATION Wheel Bearings Problem Brake overheating, side pull, brakes do not operate, poor brake After every 6 months of operation inspect the wheel bearings. performance. Once a year, or when required, disassemble the wheel hubs i t u remove the old grease and repack the bearings forcing grease i k a i l y...
Page 91
Discount-Equipment.com is your online resource for quality parts & equipment. Florida: 561-964-4949 Outside Florida TOLL FREE: 877-690-3101 Need parts? Click on this link: http://www.discount-equipment.com/category/5443-parts/ choose one of the options to help get the right parts and equipment you are looking for.
Need help?
Do you have a question about the MAYCO ST-70 and is the answer not in the manual?
Questions and answers