Download Print this page

Hoffman PCFF1YZ Manual page 10

Purge/pressurization

Advertisement

1.
With aid of supplied mounting template, cut mounting holes into enclosure. Ensure that Control Unit and Relief Valve are
diagonally opposed.
2.
Fix Control Unit to enclosure
3.
Fix Relief Valve to enclosure
4.
For Continuous Flow units only, select orifice for required purge flow rate and fit into Spark Arrestor with circle-clip. Fix
Spark Arrestor to Enclosure ensuring that Control Unit and Spark Arrestor are diagonally opposed.
5.
Connect output (dry contact alarm) as required
6.
Connect isolated air supply to Control Unit
7.
Ensure enclosure door is closed, fully latched and free of leaks
8.
Turn on 60 PSIG (4 bar) air supply (115 PSIG/8 bar max)
9.
Slowly increase Flow Control Valve until Alarm Indicator turns from RED to GREEN
10. After Purge time has been completed power can be applied to the enclosure
11. Refer to manual for assistance
PCFF1YZ

Advertisement

loading

This manual is also suitable for:

Pcfb1yz