Installation Choose a suitable location to mount the console, secure from unauthorized access to prevent tempering with the instrument, not too distant from the bore well and has easy reach to power socket. After finalizing the mounting location, check the availability of power by connecting a 12 volts 1A DC adapter Measure the length of cable to suspend into the bore well from the ground level and tie the cable firmly at the point where it leads into the bore well to avoid slipping.
Page 9
Fasten the cable or suspension system to the well head using tie wraps or a weatherproof strain-relief system. If the vent tube is incorporated in the cable, make sure not to pinch the cable too tightly or the vent tube may be obstructed.
Operational Function How to feed wire length? • 1. Select menu button > go to “cable length”. 2. Select cable length option by pressing menu button. 3. Set your value with “up” and “down” button. 4. After putting value press menu again to select that value. How to calibrate your sensor to zero value.
Page 11
feed save interval? How to • 5. Select menu button > go to “save interval”. 6. Select option by pressing menu button. 7. Set your value with “up” and “down” button. 8. After putting value press menu again to select that desire interval.
Page 12
Thanks for connecting with Green Flowtech Engineering...
Need help?
Do you have a question about the GWLR and is the answer not in the manual?
Questions and answers