Advertisement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DOSABOX and is the answer not in the manual?

Questions and answers

Summary of Contents for irritec DOSABOX

  • Page 2 Dear Customer, for a proper use of the DOSABOX, we invite you to read carefully this manual before installing the machinery. Please make sure that the model meets the specifications required and that all the accessories are included. If something shouldnʼt match, please contact the IRRITEC, or your retailer as soon as possible.
  • Page 3 Power connection - Open the control panel and link the power supply (220 VAC) to its terminal. Installation of PH/EC Sensors - Put the two sensors inside the probe holder. - Arrange a ½” derivation (about two meters after the injection point) to feed the probe holder.
  • Page 4 - Clean and calibrate the pH and EC sensors (in accordance with instructions attached) at least once a month Irritec S.p.A. Via Gambitta Conforto, C.da S. Lucia 98071 Capo d'Orlando (Me) - Italy Tel. +39 0941922111 - Fax +39 0941958807 www.irritec.com - irritec@irritec.com...

Table of Contents