Download Print this page

Diagram; Parts List; Uncoiling Instructions - CDI FF2 Instructions Manual

Flexible furler

Advertisement

Diagram

*FF6 pictured

PARTS LIST

A
Halyard Top Fitting
B
Luff Extrusion/Foil
C
Halyard Assembly
D
Furling Drum/Spool
E
Shackle (2)
F
Anchor Pin (2)
G
Luff Support Pin
H
Cup
I
Anti-Rotation Strap
J
Tack Tension Line
-
Main Bearing
-
Ball Bearing Assembly
-
Thrust Washer

UNCOILING INSTRUCTIONS

CAUTION: READ BEFORE OPENING
Coiled luffs have a lot of stored energy and can spring open
with force when restraining tape is cut. It is recommended to
wear face and eye protection. Please refer to instructions
below.
The sooner you begin the uncoiling and straightening process,
the faster and easier it will be to straighten the luff.
*The luff should remain coiled for no longer than 2 weeks
Instructions for uncoiling the luff:
Note: it's best to have one person cutting the bands with at
least one other person holding onto the luff firmly, ensuring it
doesn't spring out
2011
LFF2
1932
2010
2007
1998
1) Stand the luff on its side with the tail at the top
2009
1807
2) Have one person stand with one foot on the inside of the
1081
luff while holding onto the tail firmly
7022-4
3) The second person should then cut the band of tape near
1033
the tail, while the first person is firmly holding onto the tail
1276
and gently letting out the luff
1253
4) Proceed to cut the next bands one at a time using the same
process
5) Carefully cut the last band, ensuring everyone is clear

Advertisement

loading