Page 2
TITLE HERE TITLE HERE At Deployed Logix we’re redefining rapid deployment. Through our extensive work with law enforcement, search and rescue teams, various first responders, X-SERIES MODEL SPECIFIC SHELTER COMPONENTS private organizations both domestically and abroad, and the military, our team understands that when a crisis calls, seconds count.
Page 4
S PR AY E R A D JU STM E NT D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N UNPACKING ARCH SETUP 8 ft 8 ft Before construction, determine your desired structure location. Clear the Retrieve the center arch assembly from frame wrap “A”.
Page 6
S PR AY E R A D JU STM E NT D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N PURLIN SETUP PURLIN SETUP PURLIN BAR PURLIN ARMS PURLIN x 5 Retrieve five (5) purlin bars from each “B”...
Page 8
S PR AY E R A D JU STM E NT D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N TENSION CABLES ROOF COVER INSTALLATION INTERIOR ARCH SECTIONS OUTSIDE POSTS INSIDE POSTS Retrieve tension cables from frame wrap “A”.
Page 10
S PR AY E R A D JU STM E NT D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N RAISING THE SHELTER INSULATION INSTALLATION CAUTION! KEEP HANDS CLEAR OF MOVING PARTS DURING LIFTING! RAISE ONE SIDE ONLY!
Page 12
D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N INSULATION INSTALLATION INSULATION INSTALLATION *Endwall hidden for greater clarity. After lifting the shelter, continue to attach the insulation liner to the Swing the sidewall portion of the insulation liner towards the outer frame shelter frame along the eave of the shelter.
Page 14
D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N FLOOR INSTALLATION FLOOR / SIDEWALL ATTACHMENT SIDEWALL TO FLOOR ATTACHMENT *Covers hidden for greater clarity. SIDEWALL TO FRAME ATTACHMENT Lay out the floor on the interior of the shelter, closest to one sidewall. Attach the sidewall to the lower purlin bar.
Page 16
S PR AY E R A D JU STM E NT D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N STAKING THE SHELTER SHELTER TAKEDOWN STAKE & SECURE NOTE: It is helpful to fold and stow shelter components as you dismantle them.
Page 18
D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N FLOOR REMOVAL DISCONNECT SIDEWALL / ENDWALL SIDEWALL TO FLOOR ATTACHMENT PARTIALLY REMOVE ENDWALL ROLL UP SIDEWALL ONTO ROOF UNDO STRAPS SIDEWALL TO FRAME ATTACHMENT Detach flooring from the shelter.
Page 20
D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N ENDWALL REMOVAL ENDWALL FOLDING EXTERIOR FACE UP ENDWALL REMOVE & FOLD ENDWALL With the shelter partially lowered, lift up the roof cover and detach the Lay endwall with interior facing up.
Page 22
S PR AY E R A D JU STM E NT D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N INSULATION FOLDING LOWERING THE SHELTER KEEP HANDS CLEAR OF MOVING PARTS INTERIOR FACE UP DURING LOWERING! Fold insulation liner in half along long edge.
Page 24
S PR AY E R A D JU STM E NT D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N REMOVE ROOF ROOF FOLDING EXTERIOR FACE UP REMOVE & FOLD ROOF COVER Clean roof cover and fold up towards the roof line.
Page 26
S PR AY E R A D JU STM E NT D RA IN INSTA LLATIO N DR AI N P U M P INSTAL L ATI O N FRAME PACKING FLOOR FOLDING INTERIOR FACE UP STANDARD SHELTER COMPONENTS (TAN) Lay the two (2) leg assemblies with toes pointed in towards the center.
Need help?
Do you have a question about the X Series and is the answer not in the manual?
Questions and answers