Albixon ALBISTONE G1 BENEFIT Installation Instructions Manual

Albixon ALBISTONE G1 BENEFIT Installation Instructions Manual

Skimmer pools

Advertisement

Quick Links

Preparation for construction
Skimmer pools
ALBISTONE
®
G1 BENEFIT
G1 PLUS
Version: 12/10/2020 / Update: 31/07/2021
L. V.
www.ALBIXON.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ALBISTONE G1 BENEFIT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Albixon ALBISTONE G1 BENEFIT

  • Page 1 Preparation for construction Skimmer pools ALBISTONE ® G1 BENEFIT G1 PLUS Version: 12/10/2020 / Update: 31/07/2021 L. V. www.ALBIXON.com...
  • Page 2: Table Of Contents

    Making the Base Plate for the Final Surface Form Electrical Wiring Notes If you require any additional information, please do not hesitate to contact our customer helpline. We are here for you. Customer helpline: 477 07 07 11 www.ALBIXON.com / ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools ®...
  • Page 3: Surveying And Excavation

    Surveying and excavation 1. Layout of the Shape of the Pool. 2. Excavation Depth. 3. Preparations for Placement of Miscellaneous Technology. For the correct dimensions of the excavation, always refer to the diagrammatic drawing that is part of the contract for work. Have a construction expert confirm in writing that placement at the intended location is feasible from a constructional point of view and that it does not conflict with already installed utility lines.
  • Page 4 Surveying and excavation Plan view of the excavation for a pool with a counterflow shaft Technology wall Disconnecting shaft If the technology wall is placed higher than the water level in the pool, it is necessary to create a disconnect- ing shaft at the lowest point of the piping Excavation Foundation slab...
  • Page 5 Surveying and excavation 2. Excavation Depth – Calculation. Determine the depth of the pool excavation and of the excavation for placing the technology shaft according to the calculations below. First determine the total depth of the pool excavation. The depth of the excavation for the technology shaft (counterflow shaft) should be determined afterwards.
  • Page 6 2. 2. Surveying and excavation Excavation and Securing the Perimeter Walls. Excavation and securing of the perimeter walls of the pit (if necessary because of the geological conditions) should be carried out exclusively by a specialized company. The excavated soil can be used for landscaping around the pool;...
  • Page 7 Preparations for Placement of Miscellaneous Pool Technology. Another possible location of the technology is offered by using the ALBIXON technology wall, in its own dedicated shaft or in any other place (service room, garden house…). The pool technology should be placed in a room with limited access (protected against unauthorized persons or children), where the ambient temperature does not exceed 40 °C and where the ambient humidity is suitable for the needs of electrical components.
  • Page 8: Levelling The Bottom Of The Excavation And Drainage Of The Foundation Slab

    Levelling the Bottom of the Excavation and Drainage of the Foundation Slab 1. Installation of earth strip and drainage set – 1st Stage. An earth strip in accordance with the applicable standards must be installed at the bottom of the excavation. For more details on electrical wiring, see the Electrical Wiring section.
  • Page 9 Levelling the Bottom of the Excavation and Drainage of the Foundation Slab 3. Final Covering with Gravel, 3rd Stage. Lay another approx. 100-mm-thick layer of gravel (grain size 8–16 mm) on top of the first layer of gravel with the laid drainage pipes covered with geotextile. The gravel needs to be adequately compacted, but be careful not to damage the drainage pipes.
  • Page 10: Concreting Of The Foundation Slab

    Concreting of the Foundation Slab 1. Preparation of formwork for concreting. Place the formwork on the compacted layer according to the floor plan dimensions on page 4. The formwork height of 200 mm needs to be adjusted to the other height parameters – page 5. The formwork must be level.
  • Page 11: Notification Of Readiness For Construction

    Please send this form along with complete photo documentation to: montaze.bazeny@albixon.cz * The blank form can be found on page 21. * The blank form can be found on page 21. ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools /...
  • Page 12: Placing The Pool Shell And Installation Of The Pool Technology

    Placing the Pool Shell and Installa- tion of the Pool Technology 1. Laying the thermal insulation. 1st Stage Place thermal insulation (extruded polystyrene, 30 mm in thickness, with a minimum compressive strength of 200 kPa) on the foundation slab, under the bottom of the pool, and secure it against shift. 2.
  • Page 13: Bracing The Pool

    Bracing the Pool Bracing the Pool Shell Before concreting, appropriate bracing needs to be put in place to support the pool shell. The braces are placed in order to prevent any potential deformations of the pool shell. Deformations may be caused by careless handling of the concrete (such as when backfilling with concrete that is too thin or when tamping it), or by too high an added water level.
  • Page 14: Concreting Around The Pool

    Concreting around the pool 1. Lining the supporting walls and concreting around the pool shell Before commencing the lining and concreting works, all elements of the technology (e.g. circulation nozzles, pipes, fittings, etc.) must be fitted with suitable insulation – for example, MIRELON sleeves with a thickness of 10 mm.
  • Page 15 Concreting around the pool 2. Concreting of Technology Shaft (if part of the contract for work) The technology shaft is to be fitted with a lining or concreting. The lower part of the technology shaft must be anchored in concrete and then lined with concrete in a layer about 150 mm thick up to the top plastic collar, which must be concreted into the base plate for the final surface.The technology shaft can be protected against damage by geotextile.
  • Page 16: Making The Base Plate For The Final Surface

    Making the Base Plate for the Final Surface 1. Measures against Damage to the External Shell of the Pool. Protect the pool shell around the perimeter against damage in a suitable manner, e.g. by applying a mirelon tape, which protects the outer shell from damage by sharp objects and, at the same time, allows for dilatation. Measure the height at which you will need the cover of the skimmer;...
  • Page 17 ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools / ®...
  • Page 18 POSSIBLE FINISHING WORKS FOR ALBISTONE POOLS: POSSIBLE FINISHING WORKS FOR ALBISTONE POOLS: edge tube edge tube permanently elastic sealant reinforcing wire reinforcing wire slid through the edge permanently elastic sealant slid through the edge paving paving Mirelon Mirelon concrete concrete concrete crushed aggregate concrete...
  • Page 19 Submission of this duly completed and confirmed customer statement is a condition of entering into an agreement for the handover of the workplace and starting works by ALBIXON a. s. ALBIXON a. s. points out that in case of delay in notification of construction readiness, the delivery date specified in the agreement will be extended accordingly.
  • Page 20 Submission of this duly completed and confirmed customer statement is a condition of entering into an agreement for the handover of the workplace and starting works by ALBIXON a. s. ALBIXON a. s. points out that in case of delay in notification of construction readiness, the delivery date specified in the agreement will be extended accordingly.
  • Page 21: Form

    Photo documentation of the driveway from the road to the excavation site Parking place Entrance for the vehicle Access road to the property with the pool to install Please send this form along with complete photo documentation to: montaze.bazeny@albixon.cz ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools / ®...
  • Page 22: Electrical Wiring

    Electrical Wiring / ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools ®...
  • Page 23 Electrical Wiring Filtration; XHP60-160 thermal pump without counterflow CYKY 3 J x 4 + CY 6 ZŽ supply cable (main protective connection, hereinafter "HOP") including current protector with residual current 30 mA 20A/1/B supply cable circuit breaker n 25A/3/B main house circuit breaker Filtration;...
  • Page 24 Electrical Wiring Cables for pool lights n CYKY 3 J x 2.5 cable between light up to 50W and transformer for lights n CYKY 2 J x 4 cable between light up to 100W and transformer for lights n CYKY 2 J x 6 cable between light up to 300W and transformer for lights n the circuit breaker in the pool switchboard for the light transformer is to be determined according to the final sum of the values (W) of the lights Cables for the heat pump XHP/XHPFD 40-140...
  • Page 25 Electrical Wiring ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools / ®...
  • Page 26 Electrical Wiring / ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools ®...
  • Page 27 Electrical Wiring ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools / ®...
  • Page 28 Electrical Wiring / ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools ®...
  • Page 29: Notes

    Notes ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools / ®...
  • Page 30 Notes / ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools ®...
  • Page 31 Notes ALBISTONE G1 BENEFIT/G1 PLUS Skimmer Pools / ®...