Page 2
Control Installation Having taken this approach, we have however produced a dedicated online resource with information to assist you with NEO installation and commissioning. Here you will have access to mounting and wiring information and guided videos of Wiring Options NEO’s 5 step commissioning process.
Page 3
Control Installation 100mm CTR Mounting Bracket Ø36mm Location • ENSURE that the wall controller is installed in a location that is within the range of Please note that there is applicable WiFi access point. The distance is dependent on router model and brand. a return lip on the rear Refer to your unit access point manual.
Page 4
RJ45 Installation Hard Wired Installation Power Supply - (Yellow Cat5E spec cables with RJ45 connectors & cable boots) Power Supply - (Yellow Cat5E spec cables) 90m max cable length Controller 1 90m max Controller 1 (each) cable length (each) Indoor Board Controller 2 Indoor Board Controller 2...
Page 5
Easy and intuitive step-by-step commissioning. SAFETY INFORMATION When you power on NEO for the first time you’ll be prompted with our guided step-by-step setup process, making • Only licensed HVAC technicians* should install and service this air conditioning controller. Improper service or alteration by commissioning as simple as a few touches of the wall controller.
Page 6
Toughened glass front, ABS plastic back Casing colour Jet Black / Ceramic White Maximum zones 8 zones NEO Connect Mobile App Compatible with ActronAir model NTW-1000, NTB-1000 Platform iOS and Android iOS 9 or later – Android Version 6 Marshmallow or later...
Need help?
Do you have a question about the neo and is the answer not in the manual?
Questions and answers