Fig. 100: Fitting The Upper Fastening Strips; Fig. 101: Fitting The Bottom Fastening Strip; Table 61: Tightening Torque (51007) - ABB HT613306 Operation Manual

Table of Contents

Advertisement

Operation Manual / A150-M58/68
12 Dismantling and fitting, special tools for fastening strips / 12.1 Ap-
plication, special tools
Fitting the fastening strips
Fig. 100: Fitting the upper fastening strips
Product
Size
Tightening torque [Nm]
A150-M58/68
M16
175
Table 61: Tightening torque (51007)
1. Fit nuts (51007) of the (upper) fastening strips (51002) shown in the picture and tighten
with the torque spanner (02) without a spanner holder. Observe the tightening torque.
Fig. 101: Fitting the bottom fastening strip
2. Position the collection tray (01) to catch any fixing elements if they fall.
3. Tighten the two nuts on one side using the spanner holder (90165).
4. Tighten the two nuts on the other side using the spanner holder (90166).
The cartridge group is fitted at this point in time. In order to provide a clear representation
of the work step, the cartridge group is not illustrated in work step 5.
© Copyright 2022 ABB. All rights reserved.
HZTL4041_EN
Rev.F
February 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

A150-m58

Table of Contents