Summary of Contents for Xylem BLOX V-BLOX-DRG20 Series
Page 1
V-BLOX-DRG24XX V-BLOX-DRG30XX THANK YOU FOR CHOOSING XYLEM Please take a few minutes to review this manual before you start installation. If you encounter any installation problems, please don’t hesitate to contact us. Before you begin, please observe all local building codes. Unpack the new product and inspect for damage.
Page 2
WALL PREPARATION Notch studs 1-1/2" (38mm) to provide support for header. Extend the header beyond the countertop to the nearest stud. 2” x 12” Header SUGGESTED HEIGHT: Application Z (inch) Undermount 35” Vessel 32” Finished Wall INSTALLATION INSTRUCTIONS Remove wood supports from the back of vanity.
Page 3
INSTALLATION INSTRUCTIONS HARDWARE INCLUDED Level the vanity with a leveler and attach the brackets to the 2 x 12 header using screws provided. CARE AND CLEANING • To maintain the beauty of the finish, avoid placing the furniture in direct sunlight, as sunlight causes fading. Also avoid extreme changes in temperature by arranging furniture away from radiators, heat and air vents, and air conditioning units.
Page 4
ADJUSTMENT SIDE CAM HEIGHT TILT Rev 2/10 For customer support please visit www.xylem.biz or call 866 395 8112 weekdays 8:00 to 5:00 EST or fax 866 395 8113 any time...