Installing The Cartridge Group; Fig. 44: Measuring The End Position Of The Nozzle Ring; Fig. 45: Lifting The Cartridge Group And Rotating It; Table 36: End Position Of The Nozzle Ring, Control Dimension H - ABB HT598519 Operation Manual

Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-H.. - A140-H
8 Dismantling and fitting / 8.14 Installing the cartridge group
The end position of the nozzle ring (56001) in the turbine casing (51000) can be checked via
dimension H.
Fig. 44: Measuring the end position of the nozzle ring
Product
A130-H
A135-H
A140-H
Table 36: End position of the nozzle ring, control dimension H
1. Measure dimension H as shown in the illustration and compare it with the minimum di-
mension H in the table.
8.14

Installing the cartridge group

Lifting the cartridge group and rotating it by 90°
Fig. 45: Lifting the cartridge group and rotating it by 90°
1. Loosen and remove nuts.
2. Lift the cartridge group out of the service support (90012).
3. Insert the screws of the service support from above and fit ring nuts (VRM) with washers.
4. Attach lifting gear to the ring nuts (VRM).
5. Lift cartridge group at the side of the ring nuts (VRM) and turn it into a vertical position.
© Copyright 2020 ABB. All rights reserved.
Dimension H [mm]
HZTL4030_EN
≥11.00
≥13.50
≥16.50
Rev.F
February 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

A140-h56

Table of Contents